Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling

被引:80
|
作者
Kim, KW
Yun, YS
Yoon, JM
Gen, M [1 ]
Yamazaki, G
机构
[1] Waseda Univ, Grad Sch Informat Prod & Syst, Kitakyushu, Fukuoka 8080135, Japan
[2] Tokyo Metropolitan Inst Technol, Dept Intelligent Syst, Tokyo 1900065, Japan
[3] Daegu Univ, Sch Automot Ind & Mech Engn, Kyungbuk 712714, South Korea
[4] Seoul Natl Univ Technol, Dept Comp Sci & Engn, Seoul 139743, South Korea
关键词
resource-constrained project scheduling problem; scheduling; hybrid genetic algorithm; fuzzy logic controller;
D O I
10.1016/j.compind.2004.06.006
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we propose a hybrid genetic algorithm with fuzzy logic controller (flc-hGA) to solve the resource-constrained multiple project scheduling problem (rc-mPSP) which is well known NP-hard problem. Objectives described in this paper are to minimize total project time and to minimize total tardiness penalty. However, it is difficult to treat the rc-mPSP problems with traditional optimization techniques. The proposed new approach is based on the design of genetic operators with fuzzy logic controller (FLC) through initializing the revised serial method which outperforms the non-preemptive scheduling with precedence and resources constraints. For these rc-mPSP problems, we demonstrate that the proposed flc-hGA yields better results than conventional genetic algorithms and adaptive genetic algorithm. (C) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:143 / 160
页数:18
相关论文
共 50 条
  • [1] Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling
    Dai, T
    Kim, K
    Yokota, T
    Gen, M
    [J]. Proceedings of the Second International Conference on Information and Management Sciences, 2002, 2 : 440 - 440
  • [2] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [3] Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling
    Bettemir, Onder Halis
    Sonmez, Rifat
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (05)
  • [4] An efficient hybrid algorithm for resource-constrained project scheduling
    Chen, Wang
    Shi, Yan-jun
    Teng, Hong-fei
    Lan, Xiao-ping
    Hu, Li-chen
    [J]. INFORMATION SCIENCES, 2010, 180 (06) : 1031 - 1039
  • [5] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    [J]. NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750
  • [6] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    [J]. Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [7] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    [J]. AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [8] Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
    Fikri Kucuksayacigil
    Gündüz Ulusoy
    [J]. Frontiers of Engineering Management, 2020, 7 : 426 - 446
  • [9] Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
    Kucuksayacigil, Fikri
    Ulusoy, Gunduz
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2020, 7 (03) : 426 - 446
  • [10] A HYBRID GENETIC ALGORITHM FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH STOCHASTIC OVERLAPPING MODES
    Xie, Fang
    Yu, Jing
    Xu, Zhe
    [J]. ICIM2014: PROCEEDINGS OF THE TWELFTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2014, : 286 - 289