Adaptive utility-based scheduling in resource-constrained systems

被引:0
|
作者
Vengerov, D [1 ]
机构
[1] Sun Microsyst Labs, Menlo Pk, CA 94025 USA
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper addresses the problem of scheduling jobs in soft real-time systems, where the utility of completing each job decreases over time. We present autility-based framework for making repeated scheduling decisions based on dynamically observed information about unscheduled jobs and system's resources. This framework generalizes the standard scheduling problem to a resource-constrained environment, where resource allocation (RA) decisions (how many CPUs to allocate to each job) have to be made concurrently with the scheduling decisions (when to execute each job). Discrete-time Optimal Control theory is used to formulate the optimization problem of finding the scheduling/RA policy that maximizes the average utility per time step obtained from completed jobs. We propose a Reinforcement Learning (RL) architecture for solving the NP-hard Optimal Control problem in real time, and our experimental results demonstrate the feasibility and benefits of the proposed approach.
引用
收藏
页码:477 / 488
页数:12
相关论文
共 50 条
  • [21] A GRASP for a resource-constrained scheduling problem
    Sirdey R.
    Carlier J.
    Nace D.
    [J]. International Journal of Innovative Computing and Applications, 2010, 2 (03) : 143 - 149
  • [22] Review of Resource-Constrained Scheduling Algorithms
    Franco-Duran, Diana M.
    de la Garza, Jesus M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (11)
  • [23] Resource-constrained scheduling in repetitive projects
    Zhang, Li-hui
    Zou, Xin
    Chen, Xin-lu
    [J]. Advances in Information Sciences and Service Sciences, 2012, 4 (14): : 287 - 294
  • [24] SIMULATED ANNEALING FOR RESOURCE-CONSTRAINED SCHEDULING
    JEFFCOAT, DE
    BULFIN, RL
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (01) : 43 - 51
  • [25] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    [J]. PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [26] Tabu search for resource-constrained scheduling
    Eindhoven Univ of Technology, Eindhoven, Netherlands
    [J]. Eur J Oper Res, 2-3 (266-276):
  • [27] Adaptive utility-based scheduling algorithm for multiuser MIMO uplink
    Tine Celcer
    Gorazd Kandus
    TomaŽ Javornik
    [J]. EURASIP Journal on Wireless Communications and Networking, 2011
  • [28] Adaptive utility-based scheduling algorithm for multiuser MIMO uplink
    Celcer, Tine
    Kandus, Gorazd
    Javornik, Tomaz
    [J]. EURASIP JOURNAL ON WIRELESS COMMUNICATIONS AND NETWORKING, 2011,
  • [29] AN ITERATIVE SCHEDULING TECHNIQUE FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    LI, KY
    WILLIS, RJ
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 56 (03) : 370 - 379
  • [30] Utility-based scheduling disciplines for adaptive applications over the Internet
    Salles, RM
    Barria, JA
    [J]. IEEE COMMUNICATIONS LETTERS, 2002, 6 (05) : 217 - 219