THE INTEGRATED SCHEDULING OF QUAY CRANE AND YARD TRUCK

被引:0
|
作者
Ting, Shang Xiao [1 ]
Xin, Cao Jin [2 ]
Bin, Jia [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing 100044, Peoples R China
[2] Inner Mongolia Univ, Transportat Inst, Hohhot 010070, Peoples R China
基金
中国国家自然科学基金;
关键词
Quay crane scheduling; Yard truck scheduling; Dual-cycling strategies; Genetic algorithm; CONTAINER; ALGORITHM; VEHICLES;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Quay crane scheduling and yard truck scheduling are two highly interrelated important sub-problems in container terminal operations. To increase the efficiency, it is necessary to solve these two sub-problems in an integrated manner. The dual-strategies are adopted to increase the utilization rate of resources and reduce the empty running rate of yard truck. This paper proposed a mixed integer programming model using dual-strategies to solve quay crane scheduling and yard truck scheduling jointly. In this model, outbound and inbound containers, container precedence, quay crane interference, and quay crane safety margin are considered. Due to the intractability, genetic algorithm is designed to obtain near-optimal solutions.
引用
收藏
页码:2271 / 2277
页数:7
相关论文
共 50 条
  • [21] An Integrated Quay Crane Assignment and Scheduling Problem
    Diabat, Ali
    Theodorou, Effrosyni
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 73 : 115 - 123
  • [22] A quay crane scheduling method considering interference of yard cranes in container terminals
    Jung, Da Hun
    Park, Young-Man
    Lee, Byung Kwon
    Kim, Kap Hwan
    Ryu, Kwang Ryel
    [J]. MICAI 2006: ADVANCES IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4293 : 461 - +
  • [23] A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
    Kizilay, Damla
    Eliiyi, Deniz Tursel
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2021, 33 (01) : 1 - 42
  • [24] A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
    Damla Kizilay
    Deniz Türsel Eliiyi
    [J]. Flexible Services and Manufacturing Journal, 2021, 33 : 1 - 42
  • [25] The Quay Crane Scheduling Problem
    Al-Dhaheri, Noura
    Diabat, Ali
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 87 - 94
  • [26] Berth allocation and quay crane-yard truck assignment considering carbon emissions in port area
    Wang, Tingsong
    Li, Man
    Hu, Hongtao
    [J]. INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2019, 11 (2-3) : 216 - 242
  • [27] The Influence of the Quay Crane Traveling Time for the Quay Crane Scheduling Problem
    Yang, Kong-hung
    [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1298 - 1301
  • [28] Modeling of integrated quay cranes, yard trucks and yard cranes scheduling problem for outbound containers
    Xiao, Yujie
    Zheng, Yan
    Li, Peng
    [J]. PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND ENGINEERING APPLICATIONS, 2016, 63 : 38 - 43
  • [29] Column Generation for the Integrated Berth Allocation, Quay Crane Assignment, and Yard Assignment Problem
    Wang, Kai
    Zhen, Lu
    Wang, Shuaian
    Laporte, Gilbert
    [J]. TRANSPORTATION SCIENCE, 2018, 52 (04) : 812 - 834
  • [30] The integrated quay crane assignment and scheduling problems with carbon emissions considerations
    Kenan, Nabil
    Jebali, Aida
    Diabat, Ali
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 165