THE INTEGRATED SCHEDULING OF QUAY CRANE AND YARD TRUCK

被引:0
|
作者
Ting, Shang Xiao [1 ]
Xin, Cao Jin [2 ]
Bin, Jia [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing 100044, Peoples R China
[2] Inner Mongolia Univ, Transportat Inst, Hohhot 010070, Peoples R China
基金
中国国家自然科学基金;
关键词
Quay crane scheduling; Yard truck scheduling; Dual-cycling strategies; Genetic algorithm; CONTAINER; ALGORITHM; VEHICLES;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Quay crane scheduling and yard truck scheduling are two highly interrelated important sub-problems in container terminal operations. To increase the efficiency, it is necessary to solve these two sub-problems in an integrated manner. The dual-strategies are adopted to increase the utilization rate of resources and reduce the empty running rate of yard truck. This paper proposed a mixed integer programming model using dual-strategies to solve quay crane scheduling and yard truck scheduling jointly. In this model, outbound and inbound containers, container precedence, quay crane interference, and quay crane safety margin are considered. Due to the intractability, genetic algorithm is designed to obtain near-optimal solutions.
引用
收藏
页码:2271 / 2277
页数:7
相关论文
共 50 条
  • [31] A tabu search algorithm for the integrated truck scheduling and storage allocation in quay
    Li, Kun
    Tang, Lixin
    SECOND INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN, VOL 2, PROCEEDINGS, 2009, : 275 - 278
  • [32] Scheduling optimization of yard crane for import containers based on truck batch arrival pattern
    Shao Q.-Q.
    Xu T.-T.
    Yang H.-Y.
    Jin Z.-H.
    Jin, Zhi-Hong (jinzhihong@dlmu.edu.cn), 1654, Northeast University (31): : 1654 - 1662
  • [33] Quay crane scheduling for an indented berth
    Lee, Der-Horng
    Chen, Jiang Hang
    Cao, Jin Xin
    ENGINEERING OPTIMIZATION, 2011, 43 (09) : 985 - 998
  • [34] Quay crane scheduling with dual cycling
    Wang, Dandan
    Li, Xiaoping
    ENGINEERING OPTIMIZATION, 2015, 47 (10) : 1343 - 1360
  • [35] Integrated planning of berth allocation, quay crane assignment and yard assignment in multiple cooperative terminals
    Guo, Liming
    Zheng, Jianfeng
    Du, Jian
    Gao, Ziyou
    Fagerholt, Kjetil
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2024, 183
  • [36] Quay crane scheduling in container terminals
    Ng, W. C.
    Mak, K. L.
    ENGINEERING OPTIMIZATION, 2006, 38 (06) : 723 - 737
  • [37] Integrated optimization on yard crane scheduling and vehicle positioning at container yards
    Zhou, Chenhao
    Lee, Byung Kwon
    Li, Haobin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2020, 138
  • [38] Integrated Bay Allocation and Yard Crane Scheduling Problem for Transshipment Containers
    Lee, Der-Horng
    Jin, Jian Gang
    Chen, Jiang Hang
    TRANSPORTATION RESEARCH RECORD, 2011, (2222) : 63 - 71
  • [39] Integrated quay crane - shuttle vehicle scheduling problem capacitated by apron buffer
    Yin, Yu-Qi
    Ge, Ying-En
    Wen, Xin
    Zhong, Meisu
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MARITIME ENGINEERING, 2022, 175 (04) : 94 - 111
  • [40] An integrated quay crane assignment and scheduling problem with several contractors in container terminals
    Safaeian, M.
    Etebari, F.
    Vahdani, B.
    SCIENTIA IRANICA, 2021, 28 (02) : 1030 - 1048