Berth allocation and quay crane-yard truck assignment considering carbon emissions in port area

被引:22
|
作者
Wang, Tingsong [1 ]
Li, Man [1 ]
Hu, Hongtao [2 ]
机构
[1] Wuhan Univ, Sch Econ & Management, Wuhan 430072, Hubei, Peoples R China
[2] Shanghai Maritime Univ, Coll Logist Engn, Shanghai 201306, Peoples R China
基金
国家教育部科学基金资助; 中国国家自然科学基金;
关键词
B-QC-YTAP; carbon emissions; service efficiency; NSGA-II; multi-objective; CONTAINER TERMINAL OPERATION; GENETIC ALGORITHM; SCHEDULING METHOD; FUEL CONSUMPTION; TRADE-OFF; EFFICIENCY; MODEL;
D O I
10.1504/IJSTL.2019.099275
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
As environmental issues become increasingly prominent, the green port has been the focus of marine industry to sustain the development of global economy. Carbon emissions of port area mainly come from water area and land area of port. The effective resource allocation and equipment assignment can not only reduce the carbon emissions, but also improve the service efficiency. Thus, this paper considers the berth-quay crane-yard truck allocation problem (B-QC-YTAP) and formulates it as a multi-objective model, where the objectives are to minimise the total carbon emissions in port area, and minimise the average waiting time in port and departure delay for each vessel. To solve the proposed model as well as obtain the Pareto optimal solutions, the non-dominated sorting genetic algorithm II (NSGA-II) is also introduced. Finally, a numerical experiment is conducted to test the effectiveness of model and algorithm, followed by the trade-off analysis between the two objectives.
引用
收藏
页码:216 / 242
页数:27
相关论文
共 50 条
  • [1] Column Generation for the Integrated Berth Allocation, Quay Crane Assignment, and Yard Assignment Problem
    Wang, Kai
    Zhen, Lu
    Wang, Shuaian
    Laporte, Gilbert
    [J]. TRANSPORTATION SCIENCE, 2018, 52 (04) : 812 - 834
  • [2] Integrated planning of berth allocation, quay crane assignment and yard assignment in multiple cooperative terminals
    Guo, Liming
    Zheng, Jianfeng
    Du, Jian
    Gao, Ziyou
    Fagerholt, Kjetil
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2024, 183
  • [3] Berth allocation and quay crane assignment considering the adoption of different green technologies
    Yu, Jingjing
    Tang, Guolei
    Voss, Stefan
    Song, Xiangqun
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2023, 176
  • [4] Berth Allocation and Quay Crane Assignment Under Uncertainties
    Tan, Caimao
    He, Junliang
    Wang, Yuancai
    [J]. TRANSDISCIPLINARY ENGINEERING FOR COMPLEX SOCIO-TECHNICAL SYSTEMS - REAL-LIFE APPLICATIONS, 2020, 12 : 263 - 270
  • [5] A Genetic Algorithm for Berth Allocation and Quay Crane Assignment
    Rodriguez-Molins, Mario
    Barber, Federico
    Sierra, Maria R.
    Puente, Jorge
    Salido, Miguel A.
    [J]. ADVANCES IN ARTIFICIAL INTELLIGENCE - IBERAMIA 2012, 2012, 7637 : 601 - 610
  • [6] Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
    Chargui, Kaoutar
    Zouadi, Tarik
    El Fallahi, Abdellah
    Reghioui, Mohamed
    Aouam, Tarik
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 154
  • [7] Functional integration approach for the berth allocation, quay crane assignment and specific quay crane assignment problems
    Karam, A.
    Eltawil, A. B.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 102 : 458 - 466
  • [8] A genetic algorithm for robust berth allocation and quay crane assignment
    Rodriguez-Molins M.
    Ingolotti L.
    Barber F.
    Salido M.A.
    Sierra M.R.
    Puente J.
    [J]. Progress in Artificial Intelligence, 2014, 2 (4) : 177 - 192
  • [9] Integrated berth allocation and quay crane assignment with maintenance activities
    Zheng, Feifeng
    Li, Ying
    Chu, Feng
    Liu, Ming
    Xu, Yinfeng
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (11) : 3478 - 3503
  • [10] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014