共 50 条
- [41] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling [J]. WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
- [43] Memetic algorithm for the resource-constrained project scheduling problem [J]. 2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
- [44] Resource-Constrained Project Scheduling Problem with Modified PSO [J]. ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
- [47] A multiobjective resource-constrained project-scheduling problem [J]. SYMBOLIC AND QUANTITATIVE APPROACHES TO REASONING WITH UNCERTAINTY, PROCEEDINGS, 2007, 4724 : 719 - +
- [49] Evaluation of Heuristics for a Resource-Constrained Project Scheduling Problem [J]. MACHINING AND ADVANCED MANUFACTURING TECHNOLOGY X, 2010, 431-432 : 122 - 125
- [50] Particle swarm optimization for resource-constrained project scheduling [J]. Int. J. Proj. Manage, 2006, 1 (83-92):