Resource-constrained project scheduling - Minimization of project duration

被引:0
|
作者
不详
机构
关键词
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:21 / 174
页数:154
相关论文
共 50 条
  • [21] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [22] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    [J]. NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [23] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [24] A SIMPLE METHOD FOR ESTIMATING THE DURATION OF A RESOURCE-CONSTRAINED PROJECT
    HALL, HM
    EVANS, GW
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1987, 12 (01) : 47 - 55
  • [25] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [26] Network decomposition techniques for resource-constrained project scheduling
    Sprecher, A
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (04) : 405 - 414
  • [27] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    [J]. JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241
  • [28] New strategies for stochastic resource-constrained project scheduling
    Salim Rostami
    Stefan Creemers
    Roel Leus
    [J]. Journal of Scheduling, 2018, 21 : 349 - 365
  • [29] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    [J]. Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [30] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    [J]. NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750