Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: A robust exact decomposition

被引:8
|
作者
Chargui, Kaoutar [1 ]
Zouadi, Tarik [1 ]
Sreedharan, V. Raja [2 ,3 ]
机构
[1] Int Univ Rabat, Rabat Business Sch, BEAR Lab, Rocade 11100, Sala Al Jadida, Morocco
[2] Cardiff Metropolitan Univ, Cardiff Sch Management, 200 Western Ave, Cardiff CF5 2YB, Wales
[3] Woxsen Univ, Sch Business, Sangareddy, Telangana, India
关键词
Berth allocation and quay crane assignment  and scheduling; Robust optimization; Renewable energy capacity; Decomposition; YARD CRANE; TRADE-OFF; ASSIGNMENT; OPTIMIZATION; EFFICIENCY; MODEL;
D O I
10.1016/j.cor.2023.106251
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Container terminals are moving towards using renewable energy sources to manage their operations and cope with the traditional ones impacting the environment. However, renewable energy sources are limited, more costly, uncertain, and supplied in a non-continuous way. To improve operations' sustainability, terminals are called to alternate between traditional and renewable energy sources. In this context, this paper proposes a multi-objective mathematical model to solve the berth and quay crane allocation and scheduling problem (BACASP), considering energy uncertainty and operations' sustainability. The model considers two conflicting objectives: maximising renewable energy usage and minimising operational and energy costs. A robust version of the model is proposed to handle the uncertainty of renewable energy availability, whose objective is to optimize the worst-case scenario. Since many uncertain scenarios are involved, a simple commercial solver could not solve the model, even for small instances. Thus, we propose an exact decomposition algorithm that alleviates the model complexity, based on novel reinforcement procedures including novel set partitioning and valid inequalities, lower bounds, a warm-up scenario picking formula, speed up upper bounds, and a max-min MIP cutting pro-cedure. A series of experiments show how the proposed approach helped tighten the model bounds, improve algorithm convergence, and alleviate computational time. We also conduct an economic analysis to assess the value of integration of energy parameters within BACASP. An additional investigation is made to show how Pareto optimal curves are sensitive to the price and availability of renewable energy uncertain scenarios.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] A survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) : 615 - 627
  • [22] An Exact Algorithm for the Integrated Planning of Berth Allocation and Quay Crane Assignment
    Vacca, Ilaria
    Salani, Matteo
    Bierlaire, Michel
    TRANSPORTATION SCIENCE, 2013, 47 (02) : 148 - 161
  • [23] Simultaneous Berth and Quay Crane Allocation Problem in Container Terminal
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2113 - 2118
  • [24] The berth allocation and quay crane assignment problem with crane travel and setup times
    Correcher, Juan F.
    Perea, Federico
    Alvarez-Valdes, Ramon
    COMPUTERS & OPERATIONS RESEARCH, 2024, 162
  • [25] The integrated berth allocation, quay crane assignment and scheduling problem: mathematical formulations and a case study
    Omar Abou Kasm
    Ali Diabat
    T. C. E. Cheng
    Annals of Operations Research, 2020, 291 : 435 - 461
  • [26] Integrated berth allocation and quay crane assignment and scheduling problem under the influence of various factors
    Yu, Meng
    Liu, Xuetao
    Ji, Xiaojing
    Ren, Yucong
    Guo, Wenjing
    IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2024, 6 (04)
  • [27] A Fuzzy Optimization Model for the Berth Allocation Problem and Quay Crane Allocation Problem (BAP
    Lujan, Edwar
    Vergara, Edmundo
    Rodriguez-Melquiades, Jose
    Jimenez-Carrion, Miguel
    Sabino-Escobar, Carlos
    Gutierrez, Flabio
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2021, 9 (02) : 1 - 15
  • [28] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Abtin Nourmohammadzadeh
    Stefan Voß
    Annals of Mathematics and Artificial Intelligence, 2022, 90 : 831 - 853
  • [29] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Nourmohammadzadeh, Abtin
    Voss, Stefan
    ANNALS OF MATHEMATICS AND ARTIFICIAL INTELLIGENCE, 2022, 90 (7-9) : 831 - 853
  • [30] Exact Algorithms for Robust Quay Crane Scheduling Problems
    Li, Yitian
    Zhang, Canrong
    2021 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM21), 2021, : 1631 - 1635