Exact Algorithms for Robust Quay Crane Scheduling Problems

被引:3
|
作者
Li, Yitian [1 ,2 ]
Zhang, Canrong [1 ,2 ]
机构
[1] Tsinghua Univ, Shenzhen Int Grad Sch, Logist Engn & Simulat Lab, Shenzhen 518055, Peoples R China
[2] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
基金
中国国家自然科学基金;
关键词
Unidirectional quay crane scheduling; Uncertain processing time; Robust optimization; Benders decomposition; Column-and-constraint generation; OPTIMIZATION;
D O I
10.1109/IEEM50564.2021.9673051
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The processing time of loading and unloading tasks is usually fluctuating due to uncertain factors at container terminals. However, most research treats it as deterministic. This paper proposes a two-stage robust optimization approach to tackle the uncertainty proactively. Two kinds of cuts are proposed to tighten the searching space. Some techniques are applied to linearize the subproblem. Both Benders decomposition and column-and-constraint generation algorithms are adopted to solve the robust model, with the two algorithms compared analytically and numerically. Based on extensive experiments, we validate the effectiveness of the algorithms and find the situations that are suitable to the robust model.
引用
下载
收藏
页码:1631 / 1635
页数:5
相关论文
共 50 条
  • [1] Decomposition algorithms for the robust unidirectional quay crane scheduling problems
    Li, Yitian
    Li, Xinyi
    Zhang, Canrong
    Wu, Tao
    COMPUTERS & OPERATIONS RESEARCH, 2024, 167
  • [2] A Case Study of Genetic Algorithms for Quay Crane Scheduling
    Wang, Yi
    Chen, Yun
    Wang, Kesheng
    OPPORTUNITIES AND CHALLENGES FOR NEXT-GENERATION APPLIED INTELLIGENCE, 2009, 214 : 119 - +
  • [3] Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: A robust exact decomposition
    Chargui, Kaoutar
    Zouadi, Tarik
    Sreedharan, V. Raja
    COMPUTERS & OPERATIONS RESEARCH, 2023, 156
  • [4] Modeling and solving rich quay crane scheduling problems
    Legato, Pasquale
    Trunfio, Roberto
    Meisel, Frank
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (09) : 2063 - 2078
  • [5] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107
  • [6] A unified approach for the evaluation of quay crane scheduling models and algorithms
    Meisel, Frank
    Bierwirth, Christian
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (03) : 683 - 693
  • [7] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [8] An exact algorithm for scheduling tandem quay crane operations in container terminals
    Kong, Lingrui
    Ji, Mingjun
    Gao, Zhendi
    Transportation Research Part E: Logistics and Transportation Review, 2022, 168
  • [9] An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability
    Sun, Defeng
    Tang, Lixin
    Baldacci, Roberto
    Lim, Andrew
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (01) : 271 - 283
  • [10] An exact algorithm for scheduling tandem quay crane operations in container terminals
    Kong, Lingrui
    Ji, Mingjun
    Gao, Zhendi
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2022, 168