Risk Evaluation of Cost Overruns (COs) in Public Sector Construction Projects: A Fuzzy Synthetic Evaluation

被引:2
|
作者
Chadee, Aaron Anil [1 ]
Martin, Hector Hugh [2 ]
Gallage, Sihara [3 ]
Banerjee, Kailas Sekhar [1 ]
Roopan, Ryan [1 ]
Rathnayake, Upaka [4 ]
Ray, Indrajit [1 ]
机构
[1] Univ West Indies, Fac Engn, Dept Civil Engn, POB 331310, St Augustine, Trinidad Tobago
[2] Queens Univ, Sch Nat & Built Environm, Belfast BT7 1NN, North Ireland
[3] Sri Lanka Inst Informat Technol, Fac Engn, Dept Civil Engn, Malabe 10115, Sri Lanka
[4] Atlantic Technol Univ, Fac Engn & Design, Dept Civil Engn & Construction, Sligo F91 YW50, Ireland
关键词
risk impacts; cost overruns (COs); public sector; contracts; fuzzy model; construction; IMPACTS; DELAY; MODEL;
D O I
10.3390/buildings13051116
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the Small Island Developing States (SIDS), public sector infrastructure projects (PSIPs) fail to both meet targeted performance metrics and deliver on the intended benefits to society. In terms of the cost performance metric, cost overruns (COs) beyond the initial contract value are more of a norm than a unique occurrence. Therefore, to ensure economic sustainability for SIDS, and value for money on PSIPs, there is a need to investigate and evaluate the risk impacts on COs. The purpose of this research was to identify and evaluate the perceived cost overrun risk factors that are within the primary project stakeholders' sphere of control, and to reduce the ongoing ambiguities that exist in the prioritization of these risks. This was achieved by extracting critical risk factors from selected comparative studies in developing countries to formulate a closed-ended questionnaire to be administered to construction professionals in Trinidad and Tobago. Thereafter, the process of fuzzy synthetic evaluation (FSE) was used to develop a risk model based on three tiers of risks: 11 critical risk factors, 3 critical risk groupings (CRGs) and an overall risk level (ORL). The results showed that the two highest-ranked critical risks were project funding problems and variations by client. The leading critical risk grouping was client-related risk (5.370), followed by professional-related risk (4.815) and physical risk (4.870). The ORL was 5.068. Based on the FSE's linguistic scaling, the CRGs and the ORL are perceived to be high risks in PSIPs. This research adds to the CO body of knowledge in primarily three ways. Firstly, the study extends the comparative assessment previously undertaken in scholarship into the context of SIDS to build on the generalizability of this context-specific phenomenon. Secondly, the FSE evaluation undertaken provides a practical tool to be promoted for use in SIDS' construction industry among practitioners to focus and prioritize the critical risks in the planning phases and improve on contemporary risk practices in the execution phases of projects. Finally, this quantitative model approach is recommended to supplement the traditional qualitative risk management practices adopted in SIDS, thus contributing towards the overall improved economic sustainability and viability of PSIPs.
引用
收藏
页数:22
相关论文
共 50 条
  • [41] Significant factors causing cost overruns in large construction projects in Malaysia
    Memon, A. H., 1600, Asian Network for Scientific Information (13):
  • [42] Use of fuzzy logic for predicting design cost overruns on building projects
    Knight, K
    Fayek, AR
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (06): : 503 - 512
  • [43] TECHNIQUES TO REDUCE COST OVERRUNS DURING THE DESIGN PHASE OF CONSTRUCTION PROJECTS
    Albtoush, A. M. Faten
    Doh, S., I
    Al-Btoush, A. K. A. Mohammad
    Rahman, R. A.
    JOURNAL OF ENGINEERING SCIENCE AND TECHNOLOGY, 2022, 17 (01): : 583 - 603
  • [44] Reckoning construction cost overruns in building projects through methodological consequences
    Annamalaisami, Cindrela Devi
    Kuppuswamy, Ananthanarayanan
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (06) : 1079 - 1089
  • [45] Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam
    Thong Quoc Vu
    Cuong Phu Pham
    Thu Anh Nguyen
    Phong Thanh Nguyen
    Phuong Thanh Phan
    Quyen Le Hoang Thuy To Nguyen
    JOURNAL OF ASIAN FINANCE ECONOMICS AND BUSINESS, 2020, 7 (09): : 389 - 400
  • [46] A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects
    Zhao, Xianbo
    Hwang, Bon-Gang
    Gao, Yan
    JOURNAL OF CLEANER PRODUCTION, 2016, 115 : 203 - 213
  • [47] Developing a risk assessment model for PPP projects in China - A fuzzy synthetic evaluation approach
    Xu, Yelin
    Yeung, John F. Y.
    Chan, Albert P. C.
    Chan, Daniel W. M.
    Wang, Shou Qing
    Ke, Yongjian
    AUTOMATION IN CONSTRUCTION, 2010, 19 (07) : 929 - 943
  • [48] Evaluation of Planned Construction Projects Using Fuzzy Logic
    Gajzler, Marcin
    Zima, Krzysztof
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2017, 15 (4A) : 641 - 652
  • [49] Managing Cost Risks in Oil and Gas Construction Projects: Root Causes of Cost Overruns
    Esmaeili, Iraj
    Kashani, Hamed
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2022, 8 (01)
  • [50] Evaluation of Planned Construction Projects Using Fuzzy Logic
    Marcin Gajzler
    Krzysztof Zima
    International Journal of Civil Engineering, 2017, 15 : 641 - 652