Reckoning construction cost overruns in building projects through methodological consequences

被引:21
|
作者
Annamalaisami, Cindrela Devi [1 ]
Kuppuswamy, Ananthanarayanan [1 ]
机构
[1] Indian Inst Technol Madras, Civil Engn Dept, Chennai, Tamil Nadu, India
关键词
Construction cost overrun; project performance; cost overrun causes; cognitive map; PUBLIC-WORKS PROJECTS; INFRASTRUCTURE PROJECTS;
D O I
10.1080/15623599.2019.1683689
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction cost is considered as the most important parameter to analyze the project success. It is essential to measure the variance from the budgeted cost to understand the cost impact on project performance and profitability. Though sufficient knowledge on cost overrun has been largely shared in the extant literature, it is not adequately explained why the cost overrun keeps occurring. Hence it is necessary to investigate the relationships among cost overrun factors to improve current construction cost and controlling practices. A conceptual framework is proposed based on causal mapping, systemic and scenario understandings. The traditional forecasting methods such as trend analysis, regression models are dependent on the history while predicting the future, whereas the scenario planning and cause mapping approach suggest the alternative for the future up comings and make ready for anticipating changes. With overwhelming statistical and cognitive significance, it is evident that the cost overrun risk indicators caution the project managers in the execution of building projects. From the findings of this study, decision-makers can act on early warnings of cost variances and commendably mitigate cost overruns. The findings are expected to bridge the gap in the current construction cost management practices.
引用
收藏
页码:1079 / 1089
页数:11
相关论文
共 50 条
  • [1] Causes of cost overruns in building construction projects in Asian countries; Iran as a case study
    Amini, Shima
    Rezvani, Alireza
    Tabassi, Mohsen
    Sadati, Seyed Saeed Malek
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (07) : 2739 - 2766
  • [2] A framework for avoiding cost overruns in Malaysian construction projects
    Ullah, Kaleem
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED AND APPLIED SCIENCES, 2016, 3 (03): : 28 - 31
  • [3] Black Swans - are Cost Overruns on Construction Projects avoidable?
    Girmscheid, Gerhard
    [J]. BAUINGENIEUR, 2013, 88 : A3 - A3
  • [4] Delays and cost overruns in the construction projects in the Gaza Strip
    Enshassi, Adnan
    Al-Najjar, Jomah
    Kumaraswamy, Mohan
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2009, 14 (02) : 126 - +
  • [5] Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects
    Alhammadi, Yasir
    Al-Mohammad, Mohammad S.
    Rahman, Rahimi A.
    [J]. BUILDINGS, 2024, 14 (02)
  • [6] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Kavuma, Andrew
    Ock, Jongho
    Jang, Hyounseung
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (04) : 1442 - 1450
  • [7] Investigating cost overruns and delay in urban construction projects in Iran
    Heravi, Gholamreza
    Mohammadian, Meghdad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (09) : 958 - 968
  • [8] Remedies to Construction Projects Cost Overruns in Gauteng, South Africa
    Mukuka, Mulenga
    Aigbavboa, Clinton
    Thwala, Wellington
    [J]. PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2014, : 257 - 260
  • [9] Causes of time and cost overruns in construction projects: a scoping review
    Gomez-Cabrera, Adriana
    Gutierrez-Bucheli, Laura
    Munoz, Santiago
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (10) : 1107 - 1125
  • [10] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Andrew Kavuma
    Jongho Ock
    Hyounseung Jang
    [J]. KSCE Journal of Civil Engineering, 2019, 23 : 1442 - 1450