Causes of cost overruns in building construction projects in Asian countries; Iran as a case study

被引:14
|
作者
Amini, Shima [1 ]
Rezvani, Alireza [1 ]
Tabassi, Mohsen [1 ]
Sadati, Seyed Saeed Malek [2 ]
机构
[1] Islamic Azad Univ, Dept Architecture, Mashhad Branch, Mashhad, Razavi Khorasan, Iran
[2] Ferdowsi Univ Mashhad, Dept Econ, Mashhad, Razavi Khorasan, Iran
关键词
Cost overrun; Building construction project; Causative factors; RII; Iran; CAUSATIVE FACTORS; TIME-DELAY; CONTRACTORS; PERFORMANCE; INDUSTRY; REWORK; WORKS;
D O I
10.1108/ECAM-05-2021-0445
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Cost overruns have been identified as the most significant challenge for construction sector stakeholders. Like many developing countries, the Iranian construction industry suffers from poor cost performance. So, the current research aims to investigate the causes of cost overrun in Iranian construction projects. This paper also reviews the findings of similar studies conducted in several Asian countries. Design/methodology/approach This paper includes a literature review and a quantitative method with a questionnaire survey. The review is limited to the studies investigating the causes of cost overrun in an Asian country in the last decade. Moreover, the current research was conducted through a questionnaire prepared based on 43 common factors identified through the literature review. The required data were gathered from the representatives involved in handling construction activities in Iran. The collected data were analyzed based on relative importance index (RII), using the SPSS software package. Findings The results showed that poor site management, improper planning, fluctuation of prices of materials, lack of experience, and poor economic condition are the critical reasons for cost overrun in Iranian construction projects. The findings also indicated that among the studies conducted in Asian countries, the first three factors have the highest frequency. Originality/value This paper highlighted most studies concerning the cost overrun factors in construction projects in different Asian countries in recent years. Up-to-date knowledge helps to understand the complexity of this field in various periods and therefore minimizes the risk of cost overrun. This research can also be used as a benchmark for further studies to clarify similar issues in other developing countries.
引用
收藏
页码:2739 / 2766
页数:28
相关论文
共 50 条
  • [1] Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects
    Alhammadi, Yasir
    Al-Mohammad, Mohammad S.
    Rahman, Rahimi A.
    [J]. BUILDINGS, 2024, 14 (02)
  • [2] Investigating cost overruns and delay in urban construction projects in Iran
    Heravi, Gholamreza
    Mohammadian, Meghdad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (09) : 958 - 968
  • [3] Causes of time and cost overruns in construction projects: a scoping review
    Gomez-Cabrera, Adriana
    Gutierrez-Bucheli, Laura
    Munoz, Santiago
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (10) : 1107 - 1125
  • [4] Reckoning construction cost overruns in building projects through methodological consequences
    Annamalaisami, Cindrela Devi
    Kuppuswamy, Ananthanarayanan
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (06) : 1079 - 1089
  • [5] Managing Cost Risks in Oil and Gas Construction Projects: Root Causes of Cost Overruns
    Esmaeili, Iraj
    Kashani, Hamed
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2022, 8 (01):
  • [6] Time overruns in the construction projects in Iraq: Case study on investigating and analyzing the root causes
    Al Kulabi, Ahmed Kamil
    Atiea, Huda M. Jawad
    [J]. OPEN ENGINEERING, 2022, 12 (01): : 702 - 715
  • [7] Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects
    Alinaitwe, Henry
    Apolot, Ruth
    Tindiwensi, Dan
    [J]. JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2013, 18 (02) : 33 - 47
  • [8] An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects
    Sadat, Hafizullah
    Thomas, Nivea
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024,
  • [9] Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries
    Le-Hoai, Long
    Lee, Young Dai
    Lee, Jun Yong
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2008, 12 (06) : 367 - 377
  • [10] Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
    Long Le-Hoai
    Young Dai Lee
    Jun Yong Lee
    [J]. KSCE Journal of Civil Engineering, 2008, 12 : 367 - 377