Factors influencing Time and Cost Overruns on Freeform Construction Projects

被引:26
|
作者
Kavuma, Andrew [1 ]
Ock, Jongho [1 ]
Jang, Hyounseung [1 ]
机构
[1] Seoul Natl Univ Sci & Technol, Sch Architecture, Seoul 01811, South Korea
关键词
time overruns; cost overruns; freeform projects; Building Information Modeling (BIM); latent factors; DELAY;
D O I
10.1007/s12205-019-0447-x
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Freeform buildings differ from conventional buildings in a way that they have irregularly shaped facades. Oftentimes, freeform projects run behind schedule and over the budget. This study aimed at exploring factors that influence time and cost overruns on freeform buildings. The study employed questionnaire surveys to collect data from experts with freeform project experience, and the responses were analyzed using R statistical program. The study used exploratory factor analysis to identify the most critical latent factors to freeform project success. The study found factors related to application of Building Information Modeling (BIM) and fabrication of freeform components as very crucial to timely completion, whereas factors related to personnel involved as essential to completing within budget. Additionally, the study summarized time overrun variables into three latent factors; uniqueness, capabilities and practices of the parties involved, and level of preparation for the project. The cost overrun latent factors were: cost uncertainty, client decisions, extent of preparation, and delay. Understanding the causes of time and cost overruns on freeform buildings identified in this study can help clients make informed decisions regarding undertaking freeform projects as well as help consultants and contractors minimize the risk of encountering such overruns.
引用
收藏
页码:1442 / 1450
页数:9
相关论文
共 50 条
  • [1] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Andrew Kavuma
    Jongho Ock
    Hyounseung Jang
    [J]. KSCE Journal of Civil Engineering, 2019, 23 : 1442 - 1450
  • [2] Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam
    Thong Quoc Vu
    Cuong Phu Pham
    Thu Anh Nguyen
    Phong Thanh Nguyen
    Phuong Thanh Phan
    Quyen Le Hoang Thuy To Nguyen
    [J]. JOURNAL OF ASIAN FINANCE ECONOMICS AND BUSINESS, 2020, 7 (09): : 389 - 400
  • [3] Causes of time and cost overruns in construction projects: a scoping review
    Gomez-Cabrera, Adriana
    Gutierrez-Bucheli, Laura
    Munoz, Santiago
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (10) : 1107 - 1125
  • [4] Significant factors causing cost overruns in large construction projects in Malaysia
    [J]. Memon, A. H., 1600, Asian Network for Scientific Information (13):
  • [5] SIGNIFICANT FACTORS CAUSING TIME AND COST OVERRUNS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP: CONTRACTORS' PERSPECTIVE
    Enshassi, Adnan
    Kumaraswamy, Mohan
    Al-Najjar, Jomah
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (01) : 35 - 60
  • [6] Identification of Factors Influencing Time and Cost Risks in Highway Construction Projects
    Bakri, Anis Sazira
    Ab Razak, Muhammad Aminudin
    Abd Shukor, Ani Saifuza
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (03): : 280 - 288
  • [7] Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications
    Adam, Abderisak
    Josephson, Per-Erik Bertil
    Lindahl, Goran
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (03) : 393 - 406
  • [8] Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia
    Al-Gahtani, Khalid
    Shafaay, Maan
    Ahmed, Omar
    Alawshan, Marwan
    Alsanabani, Naif
    Aljadhai, Saad
    [J]. ADVANCES IN CIVIL ENGINEERING, 2023, 2023
  • [9] A framework for avoiding cost overruns in Malaysian construction projects
    Ullah, Kaleem
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED AND APPLIED SCIENCES, 2016, 3 (03): : 28 - 31
  • [10] Black Swans - are Cost Overruns on Construction Projects avoidable?
    Girmscheid, Gerhard
    [J]. BAUINGENIEUR, 2013, 88 : A3 - A3