Identification of Factors Influencing Time and Cost Risks in Highway Construction Projects

被引:4
|
作者
Bakri, Anis Sazira [1 ]
Ab Razak, Muhammad Aminudin [2 ]
Abd Shukor, Ani Saifuza [1 ]
机构
[1] Univ Teknol MARA, Fac Architecture Planning & Surveying, Ctr Studies Quant Surveying, Shah Alam 40450, Selangor, Malaysia
[2] Brooke Dockyard & Engn Works Corp, Sarawak, Malaysia
关键词
Highway construction; cost risk; time risk; safety risk; project objectives; MANAGEMENT; OVERRUN;
D O I
10.30880/ijscet.2021.12.03.027
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction of highway projects involves many types of risks throughout the various stages of its project life cycle. Those risks are especially significant due to their impact on the project performance and objectives, mainly in terms of costs and time. Several factors of projects risk had been determined and well explained in the paper. Major risks involved in highway construction in Malaysia are cost risk, safety risk and time risk. Due to lack of opinion from the contractors regarding the critical factors that influencing the project risks mentioned, this study aims to evaluate the contractor's perspective towards the important factors of risk particularly the cost and time risks in highway construction in Malaysia. The methodology used in this study is by using quantitative method. Questionnaire survey was developed by taking into consideration the factors influencing the cost risk and time risk that had been explained in the literature. The respondents were chosen by purposive sampling which enables the researcher to collect the data comprehensively. Results from this study confirmed that the construction risks and financial risks are most often occurred in highway projects. This research identifies potential factors influencing both cost and time risks that have a possibility to occur in highway projects in Malaysia from the perspective of contractors. Among the key findings of the factors that highly influenced the cost risks in the highway projects in Malaysia include service relocation, removal and replacement of material, design changes, additional works, environmental issues, and price fluctuation. On the other hand, the main factors influencing time risks which mostly related to time overrun/delay are permit approval, weather condition, low workers' productivity, slow preparation and drawings approval, design changes and error, and shortage of worker. This study contributes to the current body of knowledge by providing researchers and practitioners with a set of important factors related to time and cost risks that need to be consider in improving the performance of highway projects. It is hoped that this study would help the industry to promote project success of highway projects in Malaysia.
引用
收藏
页码:280 / 288
页数:9
相关论文
共 50 条
  • [1] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Kavuma, Andrew
    Ock, Jongho
    Jang, Hyounseung
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (04) : 1442 - 1450
  • [2] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Andrew Kavuma
    Jongho Ock
    Hyounseung Jang
    KSCE Journal of Civil Engineering, 2019, 23 : 1442 - 1450
  • [3] Critical factors influencing cost estimators' judgements on cost contingencies in highway construction projects: An empirical study in the UK
    Zhao, Lilin
    Wang, Jinpeng
    Zhang, Shang
    PLOS ONE, 2024, 19 (12):
  • [4] Factors affecting cost and time performance on highway construction projects: evidence from Thailand
    Meeampol, S.
    Ogunlana, S.
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2006, 11 (01) : 3 - +
  • [5] An exploration into cost-influencing factors on construction projects
    Cheng, Ying-Mei
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) : 850 - 860
  • [6] Factors influencing construction time and cost overruns on high-rise projects in Indonesia
    Kaming, P. F.
    Olomolaiye, P. O.
    Holt, G. D.
    Harris, F. C.
    Construction Management and Economics, 1997, 15 (01) : 83 - 94
  • [7] Identification of Risks for Indian Highway Construction
    Tawalare, Abhay
    3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
  • [8] Identification of factors influencing communication between participants in construction projects
    Liu, Yan
    Baldwin, Rew N.
    Shen, L. Y.
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 291 - 299
  • [9] Impact of packaging on the cost of highway construction projects
    Zhang, Zhihui
    He, Qianru
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2010, 50 (06): : 830 - 833
  • [10] A brief on cost controls of highway construction projects
    Liu, Y.
    Gong, G.
    Zhan, X.
    SUSTAINABLE BUILDINGS AND STRUCTURES: BUILDING A SUSTAINABLE TOMORROW, 2020, : 17 - 17