Impact of packaging on the cost of highway construction projects

被引:0
|
作者
Zhang, Zhihui [1 ]
He, Qianru [1 ]
机构
[1] Department of Construction Management, Tsinghua University, Beijing 100084, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:830 / 833
相关论文
共 50 条
  • [1] Impact of Correlation on Cost-Risk Analysis for Construction Highway Projects
    Tran, Dai
    Bypaneni, Sai
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 668 - 678
  • [2] A brief on cost controls of highway construction projects
    Liu, Y.
    Gong, G.
    Zhan, X.
    [J]. SUSTAINABLE BUILDINGS AND STRUCTURES: BUILDING A SUSTAINABLE TOMORROW, 2020, : 17 - 17
  • [3] CONCEPTUAL ESTIMATION OF CONSTRUCTION DURATION AND COST OF PUBLIC HIGHWAY PROJECTS
    Mohamed, Basma
    Moselhi, Osama
    [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2022, 27 : 595 - 618
  • [4] CONCEPTUAL ESTIMATION OF CONSTRUCTION DURATION AND COST OF PUBLIC HIGHWAY PROJECTS
    Mohamed, Basma
    Moselhi, Osama
    [J]. Journal of Information Technology in Construction, 2022, 27 : 595 - 618
  • [5] Identification of Factors Influencing Time and Cost Risks in Highway Construction Projects
    Bakri, Anis Sazira
    Ab Razak, Muhammad Aminudin
    Abd Shukor, Ani Saifuza
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (03): : 280 - 288
  • [6] The analysis on quality-cost of construction process in highway engineering projects
    Xiao Zelin
    [J]. PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 569 - 572
  • [7] Two-staged early cost estimation for highway construction projects
    Kim, Du Yon
    Kim, Byoungil
    Han, Seung Heon
    [J]. 25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 490 - 495
  • [8] Exploration of Early Work Packaging in Construction Manager-General Contractor Highway Projects
    Alleman, Douglas
    Papajohn, Dean
    Gransberg, Douglas D.
    El Asmar, Mounir
    Molenaar, Keith R.
    [J]. TRANSPORTATION RESEARCH RECORD, 2017, (2630) : 68 - 75
  • [9] Forecasting Completed Cost of Highway Construction Projects Using LASSO Regularized Regression
    Zhang, Yuanxin
    Minchin, R. Edward, Jr.
    Agdas, Duzgun
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (10)
  • [10] Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects
    Creedy, Garry D.
    Skitmore, Martin
    Wong, Johnny K. W.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 528 - 537