Forecasting Completed Cost of Highway Construction Projects Using LASSO Regularized Regression

被引:23
|
作者
Zhang, Yuanxin [1 ]
Minchin, R. Edward, Jr. [2 ]
Agdas, Duzgun [3 ]
机构
[1] Guangzhou Univ, Sch Management, 230 Daxuecheng Outer Ring W Rd, Guangzhou 510006, Guangdong, Peoples R China
[2] Univ Florida, Rinker Sch Construct Management, 304 Rinker Hall, Gainesville, FL 32611 USA
[3] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld 4001, Australia
关键词
Highway construction cost; Least absolute shrinkage and selection operator (LASSO); Completed cost; Ordinary least square; Parametric cost estimation; Cost and schedule; MODELS;
D O I
10.1061/(ASCE)CO.1943-7862.0001378
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Finishing highway projects within budget is critical for state highway agencies (SHAs) because budget overruns can result in severe damage to their reputation and credibility. Cost overruns in highway projects have plagued public agencies globally. Hence, this research aims to develop a parametric cost estimation model for SHAs to forecast the completed project cost prior to project execution to take necessary measures to prevent cost escalation. Ordinary least-square (OLS) regression has been a commonly used parametric estimation method in the literature. However, OLS regression has certain limitations. It, for instance, requires strict statistical assumptions. This paper proposes an alternative approach-least absolute shrinkage and selection operator (LASSO)-that has proved in other fields of research to be significantly better than the OLS method in many respects, including automatic feature selection, the ability to handle highly correlated data, ease of interpretability, and numerical stability of the model predictions. Another contribution to the body of knowledge is that this study simultaneously explores project-related variables with some economic factors that have not been used in previous research, but economic conditions are widely considered to be influential on highway construction costs. The data were separated into two groups: one for training the model and the other for validation purposes. Using the same data set, both LASSO and OLS were used to build models, and then their performance was evaluated based on the mean absolute error, mean absolute percentage error, and root-mean-square error. The results showed that the LASSO regression model outperformed the OLS regression model based on the criteria. (C) 2017 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Impact of packaging on the cost of highway construction projects
    Zhang, Zhihui
    He, Qianru
    [J]. Qinghua Daxue Xuebao/Journal of Tsinghua University, 2010, 50 (06): : 830 - 833
  • [2] A brief on cost controls of highway construction projects
    Liu, Y.
    Gong, G.
    Zhan, X.
    [J]. SUSTAINABLE BUILDINGS AND STRUCTURES: BUILDING A SUSTAINABLE TOMORROW, 2020, : 17 - 17
  • [3] Forecasting final budget and duration of highway construction projects
    Pewdum, Wichan
    Rujirayanyong, Thammasak
    Sooksatra, Vanee
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2009, 16 (06) : 544 - +
  • [4] Highway Construction Cost Forecasting Using Vector Error Correction Models
    Shahandashti, S. M.
    Ashuri, B.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (02)
  • [5] Forecasting final cost and budget of construction projects
    Teicholz, Paul
    [J]. Journal of Computing in Civil Engineering, 1993, 7 (04) : 511 - 529
  • [6] Forecasting Liquidated Damages via Machine Learning-Based Modified Regression Models for Highway Construction Projects
    Alshboul, Odey
    Alzubaidi, Mohammad A.
    Al Mamlook, Rabia Emhamed
    Almasabha, Ghassan
    Almuflih, Ali Saeed
    Shehadeh, Ali
    [J]. SUSTAINABILITY, 2022, 14 (10)
  • [7] Predicting Budgetary Estimate of Highway Construction Projects in China Based on GRA-LASSO
    Tong, Bin
    Guo, Jingjuan
    Fang, Shen
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (03)
  • [8] A new double-regularized regression using Liu and lasso regularization
    Genc, Murat
    [J]. COMPUTATIONAL STATISTICS, 2022, 37 (01) : 159 - 227
  • [9] A new double-regularized regression using Liu and lasso regularization
    Murat Genç
    [J]. Computational Statistics, 2022, 37 : 159 - 227
  • [10] CONCEPTUAL ESTIMATION OF CONSTRUCTION DURATION AND COST OF PUBLIC HIGHWAY PROJECTS
    Mohamed, Basma
    Moselhi, Osama
    [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2022, 27 : 595 - 618