Identification of Factors Influencing Time and Cost Risks in Highway Construction Projects

被引:4
|
作者
Bakri, Anis Sazira [1 ]
Ab Razak, Muhammad Aminudin [2 ]
Abd Shukor, Ani Saifuza [1 ]
机构
[1] Univ Teknol MARA, Fac Architecture Planning & Surveying, Ctr Studies Quant Surveying, Shah Alam 40450, Selangor, Malaysia
[2] Brooke Dockyard & Engn Works Corp, Sarawak, Malaysia
关键词
Highway construction; cost risk; time risk; safety risk; project objectives; MANAGEMENT; OVERRUN;
D O I
10.30880/ijscet.2021.12.03.027
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction of highway projects involves many types of risks throughout the various stages of its project life cycle. Those risks are especially significant due to their impact on the project performance and objectives, mainly in terms of costs and time. Several factors of projects risk had been determined and well explained in the paper. Major risks involved in highway construction in Malaysia are cost risk, safety risk and time risk. Due to lack of opinion from the contractors regarding the critical factors that influencing the project risks mentioned, this study aims to evaluate the contractor's perspective towards the important factors of risk particularly the cost and time risks in highway construction in Malaysia. The methodology used in this study is by using quantitative method. Questionnaire survey was developed by taking into consideration the factors influencing the cost risk and time risk that had been explained in the literature. The respondents were chosen by purposive sampling which enables the researcher to collect the data comprehensively. Results from this study confirmed that the construction risks and financial risks are most often occurred in highway projects. This research identifies potential factors influencing both cost and time risks that have a possibility to occur in highway projects in Malaysia from the perspective of contractors. Among the key findings of the factors that highly influenced the cost risks in the highway projects in Malaysia include service relocation, removal and replacement of material, design changes, additional works, environmental issues, and price fluctuation. On the other hand, the main factors influencing time risks which mostly related to time overrun/delay are permit approval, weather condition, low workers' productivity, slow preparation and drawings approval, design changes and error, and shortage of worker. This study contributes to the current body of knowledge by providing researchers and practitioners with a set of important factors related to time and cost risks that need to be consider in improving the performance of highway projects. It is hoped that this study would help the industry to promote project success of highway projects in Malaysia.
引用
收藏
页码:280 / 288
页数:9
相关论文
共 50 条
  • [41] An investigation into factors causing delays in highway construction projects in iraq
    Al Hadithi, Bevian I.
    3RD INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING, BCEE3-2017, 2018, 162
  • [42] Time and Cost Overrun in Construction Projects in Ecuador: Main Causes and Risk Factors
    Manzano-Alvarado, Mateo
    Montalban-Domingo, Laura
    Garcia-Segura, Tatiana
    Sanz-Benlloch, Amalia
    Pellicer, Eugenio
    CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 238 - 244
  • [43] Factors affecting time and cost trade-off in multiple construction projects
    Hasan, Musaab Falih
    Mohammed, Sawsan Rasheed
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 549 - 561
  • [44] Impact of Correlation on Cost-Risk Analysis for Construction Highway Projects
    Tran, Dai
    Bypaneni, Sai
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 668 - 678
  • [45] Influencing factors indicating time delay in construction projects: impact of firm size and experience
    Maqsoom, Ahsen
    Choudhry, Rafiq M.
    Umer, Muhammad
    Mehmood, Tahir
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 1 - 12
  • [46] Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects
    Matin, Danial Mirzai
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2016, 6 (04) : 1062 - 1066
  • [47] Cost and time control of construction projects: inhibiting factors and mitigating measures in practice
    Olawale, Yakubu Adisa
    Sun, Ming
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (05) : 509 - 526
  • [48] The analysis on quality-cost of construction process in highway engineering projects
    Xiao Zelin
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 569 - 572
  • [49] Two-staged early cost estimation for highway construction projects
    Kim, Du Yon
    Kim, Byoungil
    Han, Seung Heon
    25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 490 - 495
  • [50] Factors influencing school building construction projects abandonment
    Damoah, Isaac Sakyi
    Tingbani, Ishmael
    Kumi, Desmond Kwadjo
    Akwei, Cyntia C.
    Amoako, Isaac Oduro
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (06) : 961 - 976