Risk Evaluation of Cost Overruns (COs) in Public Sector Construction Projects: A Fuzzy Synthetic Evaluation

被引:2
|
作者
Chadee, Aaron Anil [1 ]
Martin, Hector Hugh [2 ]
Gallage, Sihara [3 ]
Banerjee, Kailas Sekhar [1 ]
Roopan, Ryan [1 ]
Rathnayake, Upaka [4 ]
Ray, Indrajit [1 ]
机构
[1] Univ West Indies, Fac Engn, Dept Civil Engn, POB 331310, St Augustine, Trinidad Tobago
[2] Queens Univ, Sch Nat & Built Environm, Belfast BT7 1NN, North Ireland
[3] Sri Lanka Inst Informat Technol, Fac Engn, Dept Civil Engn, Malabe 10115, Sri Lanka
[4] Atlantic Technol Univ, Fac Engn & Design, Dept Civil Engn & Construction, Sligo F91 YW50, Ireland
关键词
risk impacts; cost overruns (COs); public sector; contracts; fuzzy model; construction; IMPACTS; DELAY; MODEL;
D O I
10.3390/buildings13051116
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the Small Island Developing States (SIDS), public sector infrastructure projects (PSIPs) fail to both meet targeted performance metrics and deliver on the intended benefits to society. In terms of the cost performance metric, cost overruns (COs) beyond the initial contract value are more of a norm than a unique occurrence. Therefore, to ensure economic sustainability for SIDS, and value for money on PSIPs, there is a need to investigate and evaluate the risk impacts on COs. The purpose of this research was to identify and evaluate the perceived cost overrun risk factors that are within the primary project stakeholders' sphere of control, and to reduce the ongoing ambiguities that exist in the prioritization of these risks. This was achieved by extracting critical risk factors from selected comparative studies in developing countries to formulate a closed-ended questionnaire to be administered to construction professionals in Trinidad and Tobago. Thereafter, the process of fuzzy synthetic evaluation (FSE) was used to develop a risk model based on three tiers of risks: 11 critical risk factors, 3 critical risk groupings (CRGs) and an overall risk level (ORL). The results showed that the two highest-ranked critical risks were project funding problems and variations by client. The leading critical risk grouping was client-related risk (5.370), followed by professional-related risk (4.815) and physical risk (4.870). The ORL was 5.068. Based on the FSE's linguistic scaling, the CRGs and the ORL are perceived to be high risks in PSIPs. This research adds to the CO body of knowledge in primarily three ways. Firstly, the study extends the comparative assessment previously undertaken in scholarship into the context of SIDS to build on the generalizability of this context-specific phenomenon. Secondly, the FSE evaluation undertaken provides a practical tool to be promoted for use in SIDS' construction industry among practitioners to focus and prioritize the critical risks in the planning phases and improve on contemporary risk practices in the execution phases of projects. Finally, this quantitative model approach is recommended to supplement the traditional qualitative risk management practices adopted in SIDS, thus contributing towards the overall improved economic sustainability and viability of PSIPs.
引用
收藏
页数:22
相关论文
共 50 条
  • [1] Cost overruns of public sector construction projects: a developing country perspective
    Asiedu, Richard Ohene
    Adaku, Ebenezer
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 66 - 84
  • [2] COST AND TIME OVERRUNS IN PUBLIC-SECTOR PROJECTS
    MORRIS, S
    ECONOMIC AND POLITICAL WEEKLY, 1990, 25 (47) : M154 - M168
  • [3] Risk factors contributing to cost overruns in implementing public sector projects in China
    Shen, LY
    Deng, XP
    PROCEEDINGS OF CRIOCM 2005 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2005, : 513 - 520
  • [4] Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects
    Alinaitwe, Henry
    Apolot, Ruth
    Tindiwensi, Dan
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2013, 18 (02) : 33 - 47
  • [5] Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    PUBLIC ORGANIZATION REVIEW, 2023, 23 (03) : 1105 - 1126
  • [6] Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects
    Francisco Pinheiro Catalão
    Carlos Oliveira Cruz
    Joaquim Miranda Sarmento
    Public Organization Review, 2023, 23 : 1105 - 1126
  • [7] Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation
    Xie, Wenwen
    Deng, Binchao
    Yin, Yilin
    Lv, Xindong
    Deng, Zhenhua
    BUILDINGS, 2022, 12 (11)
  • [8] Public management and cost overruns in public projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    INTERNATIONAL PUBLIC MANAGEMENT JOURNAL, 2022, 25 (05) : 677 - 703
  • [9] Evaluation of risk management in public sector capital projects
    Baldry, David
    International Journal of Project Management, 1998, 16 (01): : 35 - 41
  • [10] Evaluation of the effect of suretyship on rapid delivery public sector construction projects
    Nemato, T.
    Maritz, M. J.
    JOURNAL OF THE SOUTH AFRICAN INSTITUTION OF CIVIL ENGINEERING, 2007, 49 (02) : 10 - 15