Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects

被引:4
|
作者
Catalao, Francisco Pinheiro [1 ]
Cruz, Carlos Oliveira [2 ]
Sarmento, Joaquim Miranda [3 ]
机构
[1] Univ Europeia, Estr Correia 53, P-1500210 Lisbon, Portugal
[2] Univ Lisbon, Inst Super Tecn, CERIS, Ave Rovisco Pais 1, P-1049001 Lisbon, Portugal
[3] Univ Lisbon, ISEG Lisbon Sch Econ & Management, Rua Miguel Lupi 20, P-1200078 Lisbon, Portugal
关键词
Accountability; Cost overruns; Cost deviation; Corruption; Public projects; DETERMINANTS; PERFORMANCE;
D O I
10.1007/s11115-022-00616-x
中图分类号
C93 [管理学]; D035 [国家行政管理]; D523 [行政管理]; D63 [国家行政管理];
学科分类号
12 ; 1201 ; 1202 ; 120202 ; 1204 ; 120401 ;
摘要
There is great public concern on cost deviations and overruns in public projects, particularly regarding the impact of corruption and accountability. To examine this question, we use a data set of over 4,000 public projects from Portugal covering a 25-year period. By using the corruption and accountability index for Portugal, we are able to focus on the potential influence of these dimensions, while controlling for institutional, political, and economic variables. Our research method follows an econometric approach, using the cost deviation and the cost overrun of each project as dependent variables. The implication of this study is that more corruption and less accountability can lead to higher cost deviations and overruns.
引用
收藏
页码:1105 / 1126
页数:22
相关论文
共 50 条
  • [1] Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects
    Francisco Pinheiro Catalão
    Carlos Oliveira Cruz
    Joaquim Miranda Sarmento
    [J]. Public Organization Review, 2023, 23 : 1105 - 1126
  • [2] COST AND TIME OVERRUNS IN PUBLIC-SECTOR PROJECTS
    MORRIS, S
    [J]. ECONOMIC AND POLITICAL WEEKLY, 1990, 25 (47) : M154 - M168
  • [3] Public management and cost overruns in public projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    [J]. INTERNATIONAL PUBLIC MANAGEMENT JOURNAL, 2022, 25 (05) : 677 - 703
  • [4] Cost overruns of public sector construction projects: a developing country perspective
    Asiedu, Richard Ohene
    Adaku, Ebenezer
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 66 - 84
  • [5] Accountability and corruption: Public sector ethics
    Preston, N
    [J]. AUSTRALIAN JOURNAL OF POLITICAL SCIENCE, 1998, 33 (02) : 313 - 313
  • [6] Risk factors contributing to cost overruns in implementing public sector projects in China
    Shen, LY
    Deng, XP
    [J]. PROCEEDINGS OF CRIOCM 2005 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2005, : 513 - 520
  • [7] PUBLIC-SECTOR - TIME AND COST OVERRUNS
    不详
    [J]. ECONOMIC AND POLITICAL WEEKLY, 1987, 22 (42-43) : 1774 - 1774
  • [8] Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects
    Alinaitwe, Henry
    Apolot, Ruth
    Tindiwensi, Dan
    [J]. JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2013, 18 (02) : 33 - 47
  • [9] Risk Evaluation of Cost Overruns (COs) in Public Sector Construction Projects: A Fuzzy Synthetic Evaluation
    Chadee, Aaron Anil
    Martin, Hector Hugh
    Gallage, Sihara
    Banerjee, Kailas Sekhar
    Roopan, Ryan
    Rathnayake, Upaka
    Ray, Indrajit
    [J]. BUILDINGS, 2023, 13 (05)
  • [10] The entanglement of time and cost deviations in public projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    [J]. ANNALS OF PUBLIC AND COOPERATIVE ECONOMICS, 2023, 94 (01) : 241 - 272