Risk Evaluation of Cost Overruns (COs) in Public Sector Construction Projects: A Fuzzy Synthetic Evaluation

被引:2
|
作者
Chadee, Aaron Anil [1 ]
Martin, Hector Hugh [2 ]
Gallage, Sihara [3 ]
Banerjee, Kailas Sekhar [1 ]
Roopan, Ryan [1 ]
Rathnayake, Upaka [4 ]
Ray, Indrajit [1 ]
机构
[1] Univ West Indies, Fac Engn, Dept Civil Engn, POB 331310, St Augustine, Trinidad Tobago
[2] Queens Univ, Sch Nat & Built Environm, Belfast BT7 1NN, North Ireland
[3] Sri Lanka Inst Informat Technol, Fac Engn, Dept Civil Engn, Malabe 10115, Sri Lanka
[4] Atlantic Technol Univ, Fac Engn & Design, Dept Civil Engn & Construction, Sligo F91 YW50, Ireland
关键词
risk impacts; cost overruns (COs); public sector; contracts; fuzzy model; construction; IMPACTS; DELAY; MODEL;
D O I
10.3390/buildings13051116
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the Small Island Developing States (SIDS), public sector infrastructure projects (PSIPs) fail to both meet targeted performance metrics and deliver on the intended benefits to society. In terms of the cost performance metric, cost overruns (COs) beyond the initial contract value are more of a norm than a unique occurrence. Therefore, to ensure economic sustainability for SIDS, and value for money on PSIPs, there is a need to investigate and evaluate the risk impacts on COs. The purpose of this research was to identify and evaluate the perceived cost overrun risk factors that are within the primary project stakeholders' sphere of control, and to reduce the ongoing ambiguities that exist in the prioritization of these risks. This was achieved by extracting critical risk factors from selected comparative studies in developing countries to formulate a closed-ended questionnaire to be administered to construction professionals in Trinidad and Tobago. Thereafter, the process of fuzzy synthetic evaluation (FSE) was used to develop a risk model based on three tiers of risks: 11 critical risk factors, 3 critical risk groupings (CRGs) and an overall risk level (ORL). The results showed that the two highest-ranked critical risks were project funding problems and variations by client. The leading critical risk grouping was client-related risk (5.370), followed by professional-related risk (4.815) and physical risk (4.870). The ORL was 5.068. Based on the FSE's linguistic scaling, the CRGs and the ORL are perceived to be high risks in PSIPs. This research adds to the CO body of knowledge in primarily three ways. Firstly, the study extends the comparative assessment previously undertaken in scholarship into the context of SIDS to build on the generalizability of this context-specific phenomenon. Secondly, the FSE evaluation undertaken provides a practical tool to be promoted for use in SIDS' construction industry among practitioners to focus and prioritize the critical risks in the planning phases and improve on contemporary risk practices in the execution phases of projects. Finally, this quantitative model approach is recommended to supplement the traditional qualitative risk management practices adopted in SIDS, thus contributing towards the overall improved economic sustainability and viability of PSIPs.
引用
收藏
页数:22
相关论文
共 50 条
  • [31] EVALUATION OF THE ORGANISATIONAL CAPABILITY OF THE PUBLIC SECTOR FOR THE IMPLEMENTATION OF BUILDING INFORMATION MODELLING ON CONSTRUCTION PROJECTS
    Yusuf, Anthony
    Opawole, Akintayo
    Ebunoluwa, Esther
    ACTA STRUCTILIA, 2022, 29 (01) : 26 - 58
  • [32] Evaluation of risk level for construction projects
    Son, K. S.
    Yang, H. S.
    SAFETY AND RELIABILITY FOR MANAGING RISK, VOLS 1-3, 2006, : 2119 - +
  • [33] THE FUZZY MODEL FOR THE EVALUATION OF PUBLIC INVESTMENT PROJECTS
    Burja, Vasile
    Burja, Camelia
    Aldea, Mihaela
    ECONOMIC WORLD DESTINY: CRISIS AND GLOBALIZATION?, SECTION IV: BANKING, ACCOUNTING AND FINANCIAL SYSTEMS FROM THE 21ST CENTURY PERSPECTIVE, 2010, : 144 - 151
  • [34] Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects
    Love, Peter E. D.
    Sing, Chun-Pong
    Carey, Brad
    Kim, Jeong Tai
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2015, 21 (02)
  • [35] Fuzzy synthetic evaluation of moral hazard and adverse selection of public private partnership projects
    Owusu-Manu, De-Graft
    Kukah, Augustine Senanu Komla
    Edwards, David John
    Ameyaw, Ernest Effah
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (11) : 1805 - 1814
  • [36] Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications
    Adam, Abderisak
    Josephson, Per-Erik Bertil
    Lindahl, Goran
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (03) : 393 - 406
  • [37] Modelling construction completion cost in Ghana public sector building projects
    Coffie G.H.
    Aigbavboa C.O.
    Thwala W.D.
    Asian Journal of Civil Engineering, 2019, 20 (7) : 1063 - 1070
  • [38] Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach
    Ameyaw, Effah Ernest
    Chan, Albert P. C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (12) : 5102 - 5116
  • [39] Research on Risk Fuzzy Comprehensive Evaluation for Construction Engineering Projects based on AHM
    Li, Gaoyang
    Packianather, Michael
    He, Chunbao
    Liu, Mingguang
    2017 IEEE INTERNATIONAL CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS (CIS) AND IEEE CONFERENCE ON ROBOTICS, AUTOMATION AND MECHATRONICS (RAM), 2017, : 605 - 608
  • [40] Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects
    Creedy, Garry D.
    Skitmore, Martin
    Wong, Johnny K. W.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 528 - 537