Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus

被引:2
|
作者
Lian, Jie [1 ]
Li, Wenjuan [2 ]
Pu, Guoli [1 ]
Zhang, Pengwei [1 ]
机构
[1] Xian Univ Technol, Sch Econ & Management, Xian 710048, Peoples R China
[2] Beijing Inst Math Sci & Applicat, Beijing 101408, Peoples R China
关键词
Seru production; Cell loading; Green scheduling; Seru reconfiguration; NSGA-II; FLEXIBLE JOB-SHOP; PERMUTATION FLOW-SHOP; ELECTRICITY CONSUMPTION; OPTIMIZATION ALGORITHM; PARALLEL MACHINES; CARBON FOOTPRINT; TIME; TARDINESS; MODEL; EARLINESS;
D O I
10.1016/j.suscom.2023.100900
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Owing to movable workstations, light equipment and multi-skilled workers, serus can be constructed, modified and dismantled rapidly. Such an advantage enables serus to be reconfigured in response to frequent changes in product types. As different configurations lead to different processing time and energy consumption, an important issue is how to arrange a best configuration of seru with the tasks assigned to it. To this end, we focus on solving the task dispatching, product sequencing and seru reconfiguration problems simultaneously considering economic and environmental performance. A bi-objective mathematical model with objectives of minimizing the total earliness and tardiness and the total carbon dioxide emission is formulated. The problem is proved to be strongly NP-hard, and a non-dominated sorting genetic algorithm-II (NSGA-II) is developed. The algorithm is tested by a medium-size numerical example and ninety sets of large-size problems. Based on the computational results, the impact of configuration flexibility and the relation between processing time and energy consumption on the value of objective functions is analyzed.
引用
收藏
页数:12
相关论文
共 50 条
  • [21] A bi-objective evolutionary algorithm for distributed production scheduling with eligibility restrictions
    Hu, Chaoming
    Zhang, Teng
    Gao, Yao
    Liu, Xinbao
    Wang, Xubiao
    APPLIED SOFT COMPUTING, 2025, 171
  • [22] Bi-objective Optimization for Joint Production Scheduling and Distribution Problem with Sustainability
    Yagmur, Ece
    Kesen, Saadettin Erhan
    COMPUTATIONAL LOGISTICS (ICCL 2021), 2021, 13004 : 269 - 281
  • [23] A Lexicographic Bi-objective Scheduling Problem From Steel Production Systems
    Zhao, Ziyan
    Zhou, MengChu
    Liu, Shixin
    Guo, Xiwang
    Liu, Haoyue
    IFAC PAPERSONLINE, 2020, 53 (05): : 158 - 163
  • [24] A Bi-objective two step Simulated Annealing Algorithm for Production Scheduling
    Chibeles-Martins, Nelson
    Marques, Anulnio
    Pinto-Varela, Tania
    27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2017, 40B : 1351 - 1356
  • [25] Energy-oriented bi-objective optimization for the tempered glass scheduling
    Liu, Ming
    Yang, Xuenan
    Chu, Feng
    Zhang, Jiantong
    Chu, Chengbin
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2020, 90
  • [26] A Hybrid Nested Partitions Method for Bi-objective Job Shop Scheduling Problem Considering Energy Consumption and Makespan
    Dai, Mei
    Li, Xin
    Mao, Limin
    ADVANCED MANUFACTURING AND AUTOMATION VII, 2018, 451 : 563 - 571
  • [27] Energy Saving Scheduling of A Single Machine System Based on Bi-objective Particle Swarm Optimization
    Wang, Junfeng
    Qian, Min
    Hu, Lingui
    Li, Shiqi
    Chang, Qing
    2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 585 - 589
  • [28] Order Acceptance and Scheduling Considering Lot-Spitting in seru Production System
    Wang, Lili
    Zhang, Zhe
    Yin, Yong
    2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 1305 - 1309
  • [29] Bi-Objective Optimization and Emergy Analysis of Multi-Distributed Energy System Considering Shared Energy Storage
    Ye, Zhaonian
    Wang, Yongzhen
    Han, Kai
    Zhao, Changlu
    Han, Juntao
    Zhu, Yilin
    SUSTAINABILITY, 2023, 15 (02)
  • [30] A bi-objective genetic algorithm for intelligent rehabilitation scheduling considering therapy precedence constraints
    Lizhong Zhao
    Chen-Fu Chien
    Mitsuo Gen
    Journal of Intelligent Manufacturing, 2018, 29 : 973 - 988