Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus

被引:2
|
作者
Lian, Jie [1 ]
Li, Wenjuan [2 ]
Pu, Guoli [1 ]
Zhang, Pengwei [1 ]
机构
[1] Xian Univ Technol, Sch Econ & Management, Xian 710048, Peoples R China
[2] Beijing Inst Math Sci & Applicat, Beijing 101408, Peoples R China
关键词
Seru production; Cell loading; Green scheduling; Seru reconfiguration; NSGA-II; FLEXIBLE JOB-SHOP; PERMUTATION FLOW-SHOP; ELECTRICITY CONSUMPTION; OPTIMIZATION ALGORITHM; PARALLEL MACHINES; CARBON FOOTPRINT; TIME; TARDINESS; MODEL; EARLINESS;
D O I
10.1016/j.suscom.2023.100900
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Owing to movable workstations, light equipment and multi-skilled workers, serus can be constructed, modified and dismantled rapidly. Such an advantage enables serus to be reconfigured in response to frequent changes in product types. As different configurations lead to different processing time and energy consumption, an important issue is how to arrange a best configuration of seru with the tasks assigned to it. To this end, we focus on solving the task dispatching, product sequencing and seru reconfiguration problems simultaneously considering economic and environmental performance. A bi-objective mathematical model with objectives of minimizing the total earliness and tardiness and the total carbon dioxide emission is formulated. The problem is proved to be strongly NP-hard, and a non-dominated sorting genetic algorithm-II (NSGA-II) is developed. The algorithm is tested by a medium-size numerical example and ninety sets of large-size problems. Based on the computational results, the impact of configuration flexibility and the relation between processing time and energy consumption on the value of objective functions is analyzed.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] A bi-objective genetic algorithm for intelligent rehabilitation scheduling considering therapy precedence constraints
    Zhao, Lizhong
    Chien, Chen-Fu
    Gen, Mitsuo
    JOURNAL OF INTELLIGENT MANUFACTURING, 2018, 29 (05) : 973 - 988
  • [32] An approach for bi-objective maintenance scheduling on a networked system with limited resources
    Urbani, Michele
    Brunelli, Matteo
    Punkka, Antti
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 305 (01) : 101 - 113
  • [33] Bi-objective decision support system for routing and scheduling of hazardous materials
    Pradhananga, Rojee
    Taniguchi, Eiichi
    Yamada, Tadashi
    Qureshi, Ali Gul
    SOCIO-ECONOMIC PLANNING SCIENCES, 2014, 48 (02) : 135 - 148
  • [34] Bi-objective optimization approach for energy aware scheduling considering electricity cost and preventive maintenance using genetic algorithm
    Sin, In Ho
    Chung, Byung Do
    JOURNAL OF CLEANER PRODUCTION, 2020, 244
  • [35] Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling
    Berrichi, A.
    Yalaoui, F.
    Amodeo, L.
    Mezghiche, M.
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) : 1584 - 1596
  • [36] Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times
    Yang, Xin
    Zeng, Zhenxiang
    Wang, Ruidong
    Sun, Xueshan
    PLOS ONE, 2016, 11 (12):
  • [37] Bi-objective workflow scheduling of the energy consumption and reliability in heterogeneous computing systems
    Zhang, Longxin
    Li, Kenli
    Li, Changyun
    Li, Keqin
    INFORMATION SCIENCES, 2017, 379 : 241 - 256
  • [38] A bi-objective low-carbon economic scheduling method for cogeneration system considering carbon capture and demand response
    Pang, Xinfu
    Wang, Yibao
    Yang, Shengxiang
    Liu, Wei
    Yu, Yang
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 243
  • [39] Energy-efficient multi-objective flexible manufacturing scheduling
    Barak, Sasan
    Moghdani, Reza
    Maghsoudlou, Hamidreza
    JOURNAL OF CLEANER PRODUCTION, 2021, 283
  • [40] A Multi-objective PSO Algorithm for Energy-efficient Scheduling
    Yang, Tianqi
    SMART MATERIALS AND INTELLIGENT SYSTEMS, PTS 1 AND 2, 2011, 143-144 : 663 - 667