Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus

被引:2
|
作者
Lian, Jie [1 ]
Li, Wenjuan [2 ]
Pu, Guoli [1 ]
Zhang, Pengwei [1 ]
机构
[1] Xian Univ Technol, Sch Econ & Management, Xian 710048, Peoples R China
[2] Beijing Inst Math Sci & Applicat, Beijing 101408, Peoples R China
关键词
Seru production; Cell loading; Green scheduling; Seru reconfiguration; NSGA-II; FLEXIBLE JOB-SHOP; PERMUTATION FLOW-SHOP; ELECTRICITY CONSUMPTION; OPTIMIZATION ALGORITHM; PARALLEL MACHINES; CARBON FOOTPRINT; TIME; TARDINESS; MODEL; EARLINESS;
D O I
10.1016/j.suscom.2023.100900
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Owing to movable workstations, light equipment and multi-skilled workers, serus can be constructed, modified and dismantled rapidly. Such an advantage enables serus to be reconfigured in response to frequent changes in product types. As different configurations lead to different processing time and energy consumption, an important issue is how to arrange a best configuration of seru with the tasks assigned to it. To this end, we focus on solving the task dispatching, product sequencing and seru reconfiguration problems simultaneously considering economic and environmental performance. A bi-objective mathematical model with objectives of minimizing the total earliness and tardiness and the total carbon dioxide emission is formulated. The problem is proved to be strongly NP-hard, and a non-dominated sorting genetic algorithm-II (NSGA-II) is developed. The algorithm is tested by a medium-size numerical example and ninety sets of large-size problems. Based on the computational results, the impact of configuration flexibility and the relation between processing time and energy consumption on the value of objective functions is analyzed.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] A fuzzy-neural and bi-objective scheduling system for job scheduling in a wafer fabrication factory
    Chen, T. (tolychen@ms37.hinet.net), 1600, Inderscience Enterprises Ltd., 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (16):
  • [42] Multi-objective optimization of energy-efficient remanufacturing system scheduling problem with lot-streaming production mode
    Tian, Guangdong
    Wang, Wenjie
    Zhang, Honghao
    Zhou, Xiaowan
    Zhang, Cheng
    Li, Zhiwu
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 237
  • [43] A bi-objective home healthcare routing and scheduling problem considering patients' satisfaction in a fuzzy environment
    Fathollahi-Fard, Amir Mohammad
    Ahmadi, Abbas
    Goodarzian, Fariba
    Cheikhrouhou, Naoufel
    APPLIED SOFT COMPUTING, 2020, 93
  • [44] Bi-objective Optimization of Ship Dam-passing Appointment Scheduling Considering Green Navigation
    Gao P.
    Liu S.
    Zhao X.
    Yu H.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2022, 22 (05): : 293 - 299+336
  • [45] A Bi-Objective Home Health Care Routing and Scheduling Model with Considering Nurse Downgrading Costs
    Khodabandeh, Pouria
    Kayvanfar, Vahid
    Rafiee, Majid
    Werner, Frank
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2021, 18 (03) : 1 - 24
  • [46] Toward an Efficient Resolution for a Single-machine Bi-objective Scheduling Problem with Rejection
    Moghaddam, Atefeh
    Teghem, Jacques
    Tuyttens, Daniel
    Yalaoui, Farouk
    Amodeo, Lionel
    FOUNDATIONS OF COMPUTING AND DECISION SCIENCES, 2019, 44 (02) : 179 - 211
  • [47] Bi-objective Synthesis of CCUS System Considering Inherent Safety and Economic Criteria
    Wang, Fei
    Wang, Fang
    Aviso, Kathleen B.
    Tan, Raymond R.
    Li, Zhiwei
    Jia, Xiaoping
    PROCESS INTEGRATION AND OPTIMIZATION FOR SUSTAINABILITY, 2023, 7 (05) : 1319 - 1331
  • [48] Energy-Efficient and Labor-Aware Production Scheduling based on Multi-Objective Optimization
    Gong, Xu
    De Pessemier, Toon
    Martens, Luc
    Joseph, Wout
    27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2017, 40B : 1369 - 1374
  • [49] Bi-objective Synthesis of CCUS System Considering Inherent Safety and Economic Criteria
    Fei Wang
    Fang Wang
    Kathleen B. Aviso
    Raymond R. Tan
    Zhiwei Li
    Xiaoping Jia
    Process Integration and Optimization for Sustainability, 2023, 7 : 1319 - 1331
  • [50] An energy-efficient scheduling strategy in LTE system
    Miao, Yali
    Wen, Kai
    2013 IEEE 11TH INTERNATIONAL CONFERENCE ON DEPENDABLE, AUTONOMIC AND SECURE COMPUTING (DASC), 2013, : 497 - 501