Order Acceptance and Scheduling Considering Lot-Spitting in seru Production System

被引:0
|
作者
Wang, Lili [1 ]
Zhang, Zhe [1 ]
Yin, Yong [2 ]
机构
[1] Nanjing Univ Sci & Technol, Sch Econ & Management, Nanjing, Peoples R China
[2] Doshisha Univ, Grad Sch Business, Karasuma Imadegawa, Japan
关键词
order acceptance and scheduling; lot-spitting; GA; seru production system;
D O I
10.1109/ieem44572.2019.8978529
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
For the manufacturing companies that take make-to-order production, due to limited production capacity, accept and process all orders may result in delayed delivery of some orders, so the companies not only have to pay a large amount of delay penalty, but also may lose a large number of customers. In this case, the order acceptance and scheduling problem in the seru production system with limited processing capability and the promised delivery time are considered in this paper. At the same time, lot-spitting is also concerned, and an integrated decision-making model for order acceptance and scheduling with the goal of maximizing net profit is established. An improved genetic algorithm is designed for the proposed model. In the end, a numerical example is applied to illustrate the validity and feasibility of the proposed model and algorithm.
引用
收藏
页码:1305 / 1309
页数:5
相关论文
共 50 条
  • [1] Order acceptance and scheduling problem with outsourcing in seru production system considering lot-spitting
    Wang, Lili
    Zhang, Zhe
    Yin, Yong
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2022, 16 (01) : 91 - 116
  • [2] An order scheduling problem in seru production system considering worker assignment
    Wang Y.
    Zhang Z.
    Yin Y.
    Zhang, Zhe (zhangzhe@njust.edu.cn), 1600, Inderscience Publishers (37): : 149 - 167
  • [3] Workload-based order acceptance in seru production system
    Wang, Yulong
    Zhang, Zhe
    Yin, Yong
    INTERNATIONAL JOURNAL OF MANUFACTURING RESEARCH, 2020, 15 (03) : 234 - 251
  • [4] Order acceptance and scheduling for precast production system considering due date assignment
    Xiong F.
    Chu M.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (06): : 1790 - 1801
  • [5] Joint decision model of Seru production system balancing considering lot-splitting
    Bai Z.-Y.
    Wang H.
    He L.
    Kongzhi yu Juece/Control and Decision, 2021, 36 (10): : 2517 - 2527
  • [6] Lot streaming in workforce scheduling problem for seru production system under Shojinka philosophy
    Yilmaz, Beren Gursoy
    Yilmaz, Omer Faruk
    Cevikcan, Emre
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 185
  • [7] Dynamic seru order acceptance and scheduling with periodic worker assignment
    Wang, Lili
    Zhang, Zhe
    Yin, Yong
    INTERNATIONAL JOURNAL OF MANUFACTURING RESEARCH, 2022, 17 (02) : 172 - 201
  • [8] A BI-LEVEL PROGRAMMING MODEL FOR SERU ORDER ACCEPTANCE AND SCHEDULING PROBLEM CONSIDERING WORKER ASSIGNMENT
    Wang, Lili
    Zhang, Zhe
    Yin, Yong
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2020, 27 (04): : 527 - 545
  • [9] Scheduling and order acceptance for the customised stochastic lot scheduling problem
    van Foreest, Nicky D.
    Wijngaard, Jacob
    van der Vaart, Taco
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (12) : 3561 - 3578
  • [10] An improved genetic algorithm for seru scheduling problem with worker assignment considering lot-splitting
    Shen L.
    Zhang Z.
    Yin Y.
    International Journal of Applied Decision Sciences, 2021, 14 (06) : 710 - 730