Order acceptance and scheduling problem with outsourcing in seru production system considering lot-spitting

被引:9
|
作者
Wang, Lili [1 ]
Zhang, Zhe [1 ]
Yin, Yong [2 ]
机构
[1] Nanjing Univ Sci & Technol, Sch Econ & Management, Nanjing 210094, Peoples R China
[2] Doshisha Univ, Grad Sch Business, Kamigyo Ku, Kyoto 6028580, Japan
基金
中国国家自然科学基金;
关键词
order acceptance and scheduling; OAS; seru; outsourcing; lot-spitting; hybrid intelligent algorithm; ANNEALING-GENETIC ALGORITHM; LOADING PROBLEM;
D O I
10.1504/EJIE.2022.119371
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper focuses on the order acceptance and scheduling problem considering lot-spitting with outsourcing decisions simultaneously in seru production system. Assume that the company's production capacity is limited, and that the outsourcer will require different outsourcing costs for different orders. Therefore, when the outsourcing cost of an order is relatively high, the company can choose to process it internally or reject the order directly, so that the company can achieve higher revenue. To solve this complex problem, a mixed 0-1 integer programming model is established, and the objective function maximisation of the net revenue is considered. Due to the complexity of the problem and model, an efficient hybrid algorithm named adaptive simulated annealing genetic algorithm (ASAGA) is designed for the proposed model. Finally, the experimental results show that the ASAGA has better optimal results and excellent scalability. [Received: 27 August 2019; Accepted: 6 February 2021]
引用
收藏
页码:91 / 116
页数:26
相关论文
共 50 条
  • [1] Order Acceptance and Scheduling Considering Lot-Spitting in seru Production System
    Wang, Lili
    Zhang, Zhe
    Yin, Yong
    2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 1305 - 1309
  • [2] An order scheduling problem in seru production system considering worker assignment
    Wang Y.
    Zhang Z.
    Yin Y.
    Zhang, Zhe (zhangzhe@njust.edu.cn), 1600, Inderscience Publishers (37): : 149 - 167
  • [3] Lot streaming in workforce scheduling problem for seru production system under Shojinka philosophy
    Yilmaz, Beren Gursoy
    Yilmaz, Omer Faruk
    Cevikcan, Emre
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 185
  • [4] A BI-LEVEL PROGRAMMING MODEL FOR SERU ORDER ACCEPTANCE AND SCHEDULING PROBLEM CONSIDERING WORKER ASSIGNMENT
    Wang, Lili
    Zhang, Zhe
    Yin, Yong
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2020, 27 (04): : 527 - 545
  • [5] Scheduling and order acceptance for the customised stochastic lot scheduling problem
    van Foreest, Nicky D.
    Wijngaard, Jacob
    van der Vaart, Taco
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (12) : 3561 - 3578
  • [6] An improved genetic algorithm for seru scheduling problem with worker assignment considering lot-splitting
    Shen L.
    Zhang Z.
    Yin Y.
    International Journal of Applied Decision Sciences, 2021, 14 (06) : 710 - 730
  • [7] Workload-based order acceptance in seru production system
    Wang, Yulong
    Zhang, Zhe
    Yin, Yong
    INTERNATIONAL JOURNAL OF MANUFACTURING RESEARCH, 2020, 15 (03) : 234 - 251
  • [8] Scheduling problem in seru production system considering DeJong’s learning effect and job splitting
    Zhe Zhang
    Xiaoling Song
    Huijun Huang
    Yong Yin
    Benjamin Lev
    Annals of Operations Research, 2022, 312 : 1119 - 1141
  • [9] Scheduling problem in seru production system considering DeJong's learning effect and job splitting
    Zhang, Zhe
    Song, Xiaoling
    Huang, Huijun
    Yin, Yong
    Lev, Benjamin
    ANNALS OF OPERATIONS RESEARCH, 2022, 312 (02) : 1119 - 1141
  • [10] A mathematical model for line-seru conversion and scheduling problem in seru production system
    Furugi, Ahad
    Haliloglu, Melis
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2022, 37 (03): : 1213 - 1223