共 50 条
- [43] A Genetic Algorithm for Solving the Economic Lot and Inspection Scheduling Problem in an Imperfect Production/Inventory System PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 345 - 350
- [44] Order Acceptance and Scheduling Problem: A Proposed Formulation and the Comparison with the Literature ADVANCES IN MANUFACTURING, PRODUCTION MANAGEMENT AND PROCESS CONTROL, 2020, 971 : 310 - 316
- [46] Imperfect Preventive Maintenance Scheduling with Partial Outsourcing Option Considering Production Constraint 2021 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM21), 2021, : 969 - 973
- [49] Integrated order acceptance and production scheduling with lead time flexibility PROCEEDINGS OF THE 2017 12TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA), 2017, : 1353 - 1358