共 50 条
- [2] FLEXIBILITY OF SCHEDULING TOOLS FOR ORDER PRODUCTION PROBLEMS [J]. COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1993, 6 (01): : 64 - 70
- [4] Coordinating order acceptance and batch delivery for an integrated supply chain scheduling [J]. Mahdavi Mazdeh, M. (mazdeh@iust.ac.ir), 1600, Materials and Energy Research Center (30):
- [6] ACLIPS: A capacity and lead time integrated procedure for scheduling [J]. MANAGEMENT SCIENCE, 1998, 44 (11) : 1548 - 1561