Order acceptance and scheduling problem with outsourcing in seru production system considering lot-spitting

被引:9
|
作者
Wang, Lili [1 ]
Zhang, Zhe [1 ]
Yin, Yong [2 ]
机构
[1] Nanjing Univ Sci & Technol, Sch Econ & Management, Nanjing 210094, Peoples R China
[2] Doshisha Univ, Grad Sch Business, Kamigyo Ku, Kyoto 6028580, Japan
基金
中国国家自然科学基金;
关键词
order acceptance and scheduling; OAS; seru; outsourcing; lot-spitting; hybrid intelligent algorithm; ANNEALING-GENETIC ALGORITHM; LOADING PROBLEM;
D O I
10.1504/EJIE.2022.119371
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper focuses on the order acceptance and scheduling problem considering lot-spitting with outsourcing decisions simultaneously in seru production system. Assume that the company's production capacity is limited, and that the outsourcer will require different outsourcing costs for different orders. Therefore, when the outsourcing cost of an order is relatively high, the company can choose to process it internally or reject the order directly, so that the company can achieve higher revenue. To solve this complex problem, a mixed 0-1 integer programming model is established, and the objective function maximisation of the net revenue is considered. Due to the complexity of the problem and model, an efficient hybrid algorithm named adaptive simulated annealing genetic algorithm (ASAGA) is designed for the proposed model. Finally, the experimental results show that the ASAGA has better optimal results and excellent scalability. [Received: 27 August 2019; Accepted: 6 February 2021]
引用
收藏
页码:91 / 116
页数:26
相关论文
共 50 条
  • [21] An integrated production and transportation scheduling problem with order acceptance and resource allocation decisions
    Aminzadegan, Sajede
    Tamannaei, Mohammad
    Fazeli, Majid
    APPLIED SOFT COMPUTING, 2021, 112
  • [22] Considering the effect of demand diversity on the performance of different production strategies for the economic lot scheduling problem
    Cortes-Fibla, Raul
    Isabel Vidal-Carreras, Pilar
    Pedro Garcia-Sabater, Jose
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1303 - 1309
  • [23] A bi-level nested heuristic algorithm for divisional seru order acceptance and scheduling problems
    Wang, Lili
    Zhang, Zhe
    Yin, Yong
    APPLIED SOFT COMPUTING, 2023, 143
  • [24] A matheuristic for the generalized order acceptance and scheduling problem
    Tarhan, Istenc
    Oguz, Ceyda
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 299 (01) : 87 - 103
  • [25] Multi-order scheduling optimisation considering product operation and worker allocation in divisional seru
    Wang Y.
    Zhang Z.
    Yin Y.
    International Journal of Applied Decision Sciences, 2021, 14 (01) : 24 - 42
  • [26] Economic lot scheduling problem with imperfect production processes
    Ben-Daya, M
    Hariga, M
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2000, 51 (07) : 875 - 881
  • [27] SCHEDULING PROCEDURES FOR SPECIAL ORDER ITEMS IN A 2-STAGE LOT PRODUCTION SYSTEM
    KUBOKAWA, S
    SOSHIRODA, M
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1980, 18 (01) : 43 - 56
  • [28] Production scheduling system with dynamic lot size in case of considering set-up time
    Koike, Minoru
    Tsumaya, Akira
    Matsui, Ryota
    Morinaga, Eiji
    Wakamatsu, Hirofumi
    Ara, Eiji
    MANUFACTURING SYSTEMS AND TECHNOLOGIES FOR THE NEW FRONTIER, 2008, : 289 - 292
  • [29] PSO-based algorithm for solving lot splitting in unbalanced seru production system
    Zhang Z.
    Shao L.
    Yin Y.
    Int. J. Ind. Syst. Eng., 2020, 4 (433-450): : 433 - 450
  • [30] Exact algorithms for a joint order acceptance and scheduling problem
    Li, Xin
    Ventura, Jose A.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 223