Simplified Solution of Time-Cost Trade-off Problem for Building Constructions by Linear Scheduling

被引:3
|
作者
Bettemir, Onder Halis [1 ]
Yucel, Tugay [1 ]
机构
[1] Inonu Univ, Malatya, Turkiye
关键词
Time-cost trade-off; Genetic algorithm; Line of balance; Optimization; Experimental design; DISCRETE-TIME; GENETIC ALGORITHM; QUALITY TRADEOFF; MODEL; OPTIMIZATION; PREDICTION; SUPPORT;
D O I
10.14525/JJCE.v17i2.10
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Time-cost trade-off is an important optimization problem for contractors, because its optimum solution minimizes the total project cost. Formation of the time-cost trade-off problem causes an important workload, since the problem requires preparation of different construction cost and duration alternatives of the activities. Previous studies focused on the optimum solution of the problem and ignored the difficulties of the preparation of the different construction alternatives for the activities, which is a very difficult task for contractors. In this study, the creation of construction alternatives consisting of different time and cost values is automated. Quantity take-off of construction items is computed by user-defined dimensions of structural elements. Workmanship and material requirements are computed by pre-defined job descriptions and quantity take-off values. Different construction alternatives are formed by assigning different crew sizes and the corresponding construction durations are computed by estimating the job efficiency of the crew by regression models derived from the literature. Precedence relationships of the main construction items are pre-defined and the construction schedule is formed by a line of balance in terms of work days. The problem is optimized by a genetic algorithm the parameters of which are fine-tuned by experimental design. The developed approach is implemented on a spreadsheet application and the total optimization process including data entry is completed in one and a half hour on a desktop computer with i5 CPU. This study contributes to relevant literature by proposing a systematic approach for the formation of construction alternatives of the time-cost trade-off problem. The proposed approach can be beneficial for contractors and project managers to form and solve the time-cost trade-off problem with minimum endeavor and cost.
引用
收藏
页码:293 / 309
页数:17
相关论文
共 50 条
  • [31] Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration
    Zou, Xin
    Fang, Shu-Cherng
    Huang, Yuan-Sheng
    Zhang, Li-Hui
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (03)
  • [32] Efficient modeling of time-cost trade-off problem by eliminating redundant paths
    Ammar, Mohammad A.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (07) : 812 - 821
  • [33] Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
    Ammar, Mohammad A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01): : 65 - 71
  • [34] A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling
    Aghassi, Hadi
    Abadi, Sedigheh Nader
    Roghanian, Emad
    KNOWLEDGE TECHNOLOGY, 2012, 295 : 356 - +
  • [35] A new approach to solve time-cost trade-off problem with fuzzy decision variables
    Ghazanfari, M.
    Yousefli, A.
    Ameli, M. S. Jabal
    Bozorgi-Amiri, A.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4): : 408 - 414
  • [36] Using ant colony algorithm to solve construction time-cost trade-off problem
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    不详
    Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
  • [37] Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
    Eshtehardian, Ehsan
    Afshar, Abbas
    Abbasnia, Reza
    AUTOMATION IN CONSTRUCTION, 2009, 18 (05) : 692 - 701
  • [38] A Dependent-Chance Programming Model for Fuzzy Time-Cost Trade-off Problem
    Ke, Hua
    Ma, Weimin
    2009 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 2009, : 2183 - 2186
  • [39] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [40] Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty
    Ouyang Yong-liu
    Zhang Meng-xiang
    Han Lu
    Lu Yi
    2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING - 22ND ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2015, : 282 - 292