Simplified Solution of Time-Cost Trade-off Problem for Building Constructions by Linear Scheduling

被引:3
|
作者
Bettemir, Onder Halis [1 ]
Yucel, Tugay [1 ]
机构
[1] Inonu Univ, Malatya, Turkiye
关键词
Time-cost trade-off; Genetic algorithm; Line of balance; Optimization; Experimental design; DISCRETE-TIME; GENETIC ALGORITHM; QUALITY TRADEOFF; MODEL; OPTIMIZATION; PREDICTION; SUPPORT;
D O I
10.14525/JJCE.v17i2.10
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Time-cost trade-off is an important optimization problem for contractors, because its optimum solution minimizes the total project cost. Formation of the time-cost trade-off problem causes an important workload, since the problem requires preparation of different construction cost and duration alternatives of the activities. Previous studies focused on the optimum solution of the problem and ignored the difficulties of the preparation of the different construction alternatives for the activities, which is a very difficult task for contractors. In this study, the creation of construction alternatives consisting of different time and cost values is automated. Quantity take-off of construction items is computed by user-defined dimensions of structural elements. Workmanship and material requirements are computed by pre-defined job descriptions and quantity take-off values. Different construction alternatives are formed by assigning different crew sizes and the corresponding construction durations are computed by estimating the job efficiency of the crew by regression models derived from the literature. Precedence relationships of the main construction items are pre-defined and the construction schedule is formed by a line of balance in terms of work days. The problem is optimized by a genetic algorithm the parameters of which are fine-tuned by experimental design. The developed approach is implemented on a spreadsheet application and the total optimization process including data entry is completed in one and a half hour on a desktop computer with i5 CPU. This study contributes to relevant literature by proposing a systematic approach for the formation of construction alternatives of the time-cost trade-off problem. The proposed approach can be beneficial for contractors and project managers to form and solve the time-cost trade-off problem with minimum endeavor and cost.
引用
收藏
页码:293 / 309
页数:17
相关论文
共 50 条
  • [21] Research on the Hierarchical Discrete Time-Cost Trade-Off Problem for Program
    Chen, Liangwei
    Zhang, Jingwen
    Peng, Wuliang
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (07)
  • [22] A New Multiobjective Time-Cost Trade-Off for Scheduling Maintenance Problem in a Series-Parallel System
    Tavassoli, Leyla Sadat
    Massah, Reza
    Montazeri, Arsalan
    Mirmozaffari, Mirpouya
    Jiang, Guang-Jun
    Chen, Hong-Xia
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [23] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
    Benjaoran, Vacharapoom
    Sae-Tae, Numpheungk
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
  • [24] Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
    Panwar, Abhilasha
    Jha, Kumar Neeraj
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [25] Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem
    Anagnostopoulos, K. P.
    Kotsikas, L.
    APPLIED MATHEMATICS AND COMPUTATION, 2010, 217 (01) : 260 - 270
  • [26] Modeling Time-Cost Trade-off Problem with Fuzzy Activity Duration Times
    Ma, Weimin
    Ke, Hua
    FOURTH INTERNATIONAL CONFERENCE ON COOPERATION AND PROMOTION OF INFORMATION RESOURCES IN SCIENCE AND TECHNOLOGY (COINFO 2009), 2009, : 344 - 347
  • [27] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126
  • [28] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [29] MINLP optimization model for the nonlinear discrete time-cost trade-off problem
    Klansek, Uros
    Psunder, Mirko
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 48 : 6 - 16
  • [30] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (03): : 475 - 486