A Contract Period Optimization Model for Water Saving Management Contract Project Based on Equipment Replacement

被引:0
|
作者
Li, Wei [1 ,2 ]
Wang, Xiaosheng [3 ]
Zhang, Qian [4 ]
机构
[1] Hebei Univ Engn, Sch Water Conservancy & Hydroelect Power, Handan 056038, Peoples R China
[2] Hebei Key Lab Intelligent Water Conservancy, Handan 056038, Peoples R China
[3] Hebei Univ Engn, Sch Math & Phys, Handan 056038, Peoples R China
[4] Univ Sains Malaysia, Sch Management, Minden 11800, Pulau Pinang, Malaysia
基金
中国国家自然科学基金;
关键词
WSMC; Contract period; Equipment replacement; Optimization; CONCESSION PERIOD; DEGRADATION; SYSTEM;
D O I
10.1007/s11269-023-03626-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Water saving management contract (WSMC) is a new water-saving strategy based on market mechanism. As a period for the water saving service company (WSSC) to provide funds and technology to water user, contract period is one of the key elements in WSMC projects. This paper attempted to establish a model to determine the optimal contract period based on equipment replacement. First, the performance degradation simulation of water-saving equipment was constructed based on degradation path model. Second, water-saving process simulation under equipment replacement was established based on measured renewal cycle of water-saving equipment. Third, a contract period optimization model for WSMC projects was built with the objective of maximizing WSSC profit net present value (NPV) and with constraints of water user incentive constraint, WSSC rational constraint, and minimal cooperation duration. Finally, a WSMC project case in China was studied and the solutions were compared with traditional model. The results showed that the optimal contract period in this paper was 3 years longer than the one in traditional model. Meanwhile, the measured equipment renewal cycle was 7 years and it was less than the estimated economic lifetime. Based on the 9-year contract, the water user's revenue was higher with 55.8% than original contract, while WSSC's profit loss was lower with 60.8% than the traditional results. The findings reveal that the implementation of an equipment replacement plan considerably boost the revenue of participants and assist WSSC in obtaining more profit.
引用
收藏
页码:5725 / 5741
页数:17
相关论文
共 50 条
  • [1] A Contract Period Optimization Model for Water Saving Management Contract Project Based on Equipment Replacement
    Wei Li
    Xiaosheng Wang
    Qian Zhang
    Water Resources Management, 2023, 37 : 5725 - 5741
  • [2] A contract period optimization model for shared water saving management contract based on win-win
    Wang, Xiaosheng
    Yang, Fan
    Li, Wei
    INTERNATIONAL JOURNAL OF GENERAL SYSTEMS, 2024, 53 (7-8) : 928 - 948
  • [3] Water-Saving Revenue Guarantee Optimization in Water Saving Management Contract Based on Simulation Method
    Wei Li
    Xiaosheng Wang
    Ran Li
    Water Resources Management, 2023, 37 : 5127 - 5146
  • [4] Water-Saving Revenue Guarantee Optimization in Water Saving Management Contract Based on Simulation Method
    Li, Wei
    Wang, Xiaosheng
    Li, Ran
    WATER RESOURCES MANAGEMENT, 2023, 37 (13) : 5127 - 5146
  • [5] A real option-based valuation model for Shared Water Saving Management Contract
    Hu, Hao
    Wang, Xiaosheng
    Gao, Zhichao
    Guo, Haiying
    JOURNAL OF CLEANER PRODUCTION, 2021, 289 (289)
  • [6] Profit allocation of benefit-sharing water saving management contract based on bargaining model
    Wang X.
    Hu H.
    Liu X.
    An X.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2020, 40 (09): : 2418 - 2426
  • [7] To Strengthen the Project Contract Management Based on "Partnership"
    Wang, Man
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 446 - 449
  • [8] MANAGEMENT BY CONTRACT - SAVING HOSPITAL MONEY
    SOUHRADA, L
    HOSPITALS, 1988, 62 (06): : 82 - 82
  • [9] Bargaining-Based Profit Allocation Model for Fixed Return Investment Water-Saving Management Contract
    Liu, Shize
    Wang, Xiaosheng
    Li, Wei
    AXIOMS, 2022, 11 (12)
  • [10] Optimal allocation of regional water resources under water saving management contract
    Xiaojie An
    Xiaosheng Wang
    Hao Hu
    Shujiang Pang
    Journal of Data, Information and Management, 2021, 3 (4): : 281 - 296