A Contract Period Optimization Model for Water Saving Management Contract Project Based on Equipment Replacement

被引:0
|
作者
Li, Wei [1 ,2 ]
Wang, Xiaosheng [3 ]
Zhang, Qian [4 ]
机构
[1] Hebei Univ Engn, Sch Water Conservancy & Hydroelect Power, Handan 056038, Peoples R China
[2] Hebei Key Lab Intelligent Water Conservancy, Handan 056038, Peoples R China
[3] Hebei Univ Engn, Sch Math & Phys, Handan 056038, Peoples R China
[4] Univ Sains Malaysia, Sch Management, Minden 11800, Pulau Pinang, Malaysia
基金
中国国家自然科学基金;
关键词
WSMC; Contract period; Equipment replacement; Optimization; CONCESSION PERIOD; DEGRADATION; SYSTEM;
D O I
10.1007/s11269-023-03626-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Water saving management contract (WSMC) is a new water-saving strategy based on market mechanism. As a period for the water saving service company (WSSC) to provide funds and technology to water user, contract period is one of the key elements in WSMC projects. This paper attempted to establish a model to determine the optimal contract period based on equipment replacement. First, the performance degradation simulation of water-saving equipment was constructed based on degradation path model. Second, water-saving process simulation under equipment replacement was established based on measured renewal cycle of water-saving equipment. Third, a contract period optimization model for WSMC projects was built with the objective of maximizing WSSC profit net present value (NPV) and with constraints of water user incentive constraint, WSSC rational constraint, and minimal cooperation duration. Finally, a WSMC project case in China was studied and the solutions were compared with traditional model. The results showed that the optimal contract period in this paper was 3 years longer than the one in traditional model. Meanwhile, the measured equipment renewal cycle was 7 years and it was less than the estimated economic lifetime. Based on the 9-year contract, the water user's revenue was higher with 55.8% than original contract, while WSSC's profit loss was lower with 60.8% than the traditional results. The findings reveal that the implementation of an equipment replacement plan considerably boost the revenue of participants and assist WSSC in obtaining more profit.
引用
收藏
页码:5725 / 5741
页数:17
相关论文
共 50 条
  • [21] Model of Human Resource Management Based on Psychological Contract
    Ma, Caifeng
    ADVANCES IN APPLIED ECONOMICS, BUSINESS AND DEVELOPMENT, PT II, 2011, 209 : 113 - 119
  • [22] Benefit Allocation in Shared Water-Saving Management Contract Projects Based on Modified Expected Shapley Value
    Xinxin Liu
    Xiaosheng Wang
    Haiying Guo
    Xiaojie An
    Water Resources Management, 2021, 35 : 39 - 62
  • [23] Benefit Allocation in Shared Water-Saving Management Contract Projects Based on Modified Expected Shapley Value
    Liu, Xinxin
    Wang, Xiaosheng
    Guo, Haiying
    An, Xiaojie
    WATER RESOURCES MANAGEMENT, 2021, 35 (01) : 39 - 62
  • [24] Water Saving Management Contract, identification and ranking of risks based on life cycle and best-worst method
    Ma, Weimin
    Li, Xiaona
    Wang, Xiaosheng
    JOURNAL OF CLEANER PRODUCTION, 2021, 306
  • [25] Discussion about the Construction Project Management Mode Based on the Contract Text
    Jiang, Yunxia
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3356 - 3361
  • [26] The contract and project quality management system based on fuzzy mathematics methods
    Wu, Xinping
    International Journal of Digital Content Technology and its Applications, 2012, 6 (14) : 77 - 85
  • [27] A relational contract for water demand management
    Amit, R. K.
    Ramachandran, Parthasarathy
    URBAN WATER JOURNAL, 2013, 10 (03) : 209 - 215
  • [28] Optimization model of interchange contract parameters
    Wang, Jian-Bin
    Kang, Yong
    Tan, Zhong-Fu
    Dianli Zidonghua Shebei / Electric Power Automation Equipment, 2007, 27 (08): : 30 - 33
  • [29] Analysis on Role of Project Contract Management in Prevention of Project Risks
    Liu, Hongmei
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY, MANAGEMENT AND HUMANITIES SCIENCE (ETMHS 2015), 2015, 27 : 706 - 710
  • [30] Reported project management effort, project size, and contract type
    Ahonen, Jarmo J.
    Savolainen, Paula
    Merikoski, Helena
    Nevalainen, Jaana
    JOURNAL OF SYSTEMS AND SOFTWARE, 2015, 109 : 205 - 213