A Contract Period Optimization Model for Water Saving Management Contract Project Based on Equipment Replacement

被引:0
|
作者
Li, Wei [1 ,2 ]
Wang, Xiaosheng [3 ]
Zhang, Qian [4 ]
机构
[1] Hebei Univ Engn, Sch Water Conservancy & Hydroelect Power, Handan 056038, Peoples R China
[2] Hebei Key Lab Intelligent Water Conservancy, Handan 056038, Peoples R China
[3] Hebei Univ Engn, Sch Math & Phys, Handan 056038, Peoples R China
[4] Univ Sains Malaysia, Sch Management, Minden 11800, Pulau Pinang, Malaysia
基金
中国国家自然科学基金;
关键词
WSMC; Contract period; Equipment replacement; Optimization; CONCESSION PERIOD; DEGRADATION; SYSTEM;
D O I
10.1007/s11269-023-03626-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Water saving management contract (WSMC) is a new water-saving strategy based on market mechanism. As a period for the water saving service company (WSSC) to provide funds and technology to water user, contract period is one of the key elements in WSMC projects. This paper attempted to establish a model to determine the optimal contract period based on equipment replacement. First, the performance degradation simulation of water-saving equipment was constructed based on degradation path model. Second, water-saving process simulation under equipment replacement was established based on measured renewal cycle of water-saving equipment. Third, a contract period optimization model for WSMC projects was built with the objective of maximizing WSSC profit net present value (NPV) and with constraints of water user incentive constraint, WSSC rational constraint, and minimal cooperation duration. Finally, a WSMC project case in China was studied and the solutions were compared with traditional model. The results showed that the optimal contract period in this paper was 3 years longer than the one in traditional model. Meanwhile, the measured equipment renewal cycle was 7 years and it was less than the estimated economic lifetime. Based on the 9-year contract, the water user's revenue was higher with 55.8% than original contract, while WSSC's profit loss was lower with 60.8% than the traditional results. The findings reveal that the implementation of an equipment replacement plan considerably boost the revenue of participants and assist WSSC in obtaining more profit.
引用
收藏
页码:5725 / 5741
页数:17
相关论文
共 50 条
  • [41] Comprehensive Evaluation of Equipment Scientific Contract Based on DHGF
    Li, Yong
    Chen, Guiming
    2011 INTERNATIONAL CONFERENCE ON EDUCATION SCIENCE AND MANAGEMENT ENGINEERING (ESME 2011), VOLS 1-5, 2011, : 721 - 724
  • [42] Risk Assessment of China's Water-Saving Contract Projects
    Li, Qian
    Shangguan, Ziheng
    Wang, Mark Yaolin
    Yan, Dengcai
    Zhai, Ruizhi
    Wen, Chuanhao
    WATER, 2020, 12 (10)
  • [43] A Ring Signature Trust Model for Project Review Based on Blockchain Smart Contract
    Fu, Hao
    Nie, Wenhai
    Liu, Li
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2021, 28 (02): : 347 - 356
  • [44] The Risk Evaluation Model of Construction Project Contract Based on BP Neural Network
    Liu, Hua
    Yang, Junfang
    Zhang, Zhiyuan
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2304 - +
  • [45] Research on optimization of rural grassroots organization management based on psychological contract relationship
    Xia, T. T.
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2018, 123 : 110 - 110
  • [46] Energy Management Contract Based on Electromechanical Load Side Optimization in Distribution Network
    Wang, Xiran
    Lai, Cong
    He, Yingjing
    Shen, Shuyi
    PROCEEDINGS OF 2017 IEEE 2ND INFORMATION TECHNOLOGY, NETWORKING, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (ITNEC), 2017, : 101 - 106
  • [47] Effective contract implementation and management: A preliminary model
    Romzek, BS
    Johnston, JM
    JOURNAL OF PUBLIC ADMINISTRATION RESEARCH AND THEORY, 2002, 12 (03) : 423 - 453
  • [48] Stockton awards design contract for delta water supply project
    Landers, Jay
    CIVIL ENGINEERING, 2007, 77 (11): : 22 - 24
  • [49] A robust R&D project portfolio optimization model for pharmaceutical contract research organizations
    Hassanzadeh, Farhad
    Modarres, Mohammad
    Nemati, Hamid R.
    Amoako-Gyampah, Kwasi
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 158 : 18 - 27
  • [50] PROJECT-MANAGEMENT ON A REIMBURSABLE, PLUS-FEE CONTRACT
    VANHEERDEN, F
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1982, 82 (11): : 329 - 335