A Contract Period Optimization Model for Water Saving Management Contract Project Based on Equipment Replacement

被引:0
|
作者
Li, Wei [1 ,2 ]
Wang, Xiaosheng [3 ]
Zhang, Qian [4 ]
机构
[1] Hebei Univ Engn, Sch Water Conservancy & Hydroelect Power, Handan 056038, Peoples R China
[2] Hebei Key Lab Intelligent Water Conservancy, Handan 056038, Peoples R China
[3] Hebei Univ Engn, Sch Math & Phys, Handan 056038, Peoples R China
[4] Univ Sains Malaysia, Sch Management, Minden 11800, Pulau Pinang, Malaysia
基金
中国国家自然科学基金;
关键词
WSMC; Contract period; Equipment replacement; Optimization; CONCESSION PERIOD; DEGRADATION; SYSTEM;
D O I
10.1007/s11269-023-03626-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Water saving management contract (WSMC) is a new water-saving strategy based on market mechanism. As a period for the water saving service company (WSSC) to provide funds and technology to water user, contract period is one of the key elements in WSMC projects. This paper attempted to establish a model to determine the optimal contract period based on equipment replacement. First, the performance degradation simulation of water-saving equipment was constructed based on degradation path model. Second, water-saving process simulation under equipment replacement was established based on measured renewal cycle of water-saving equipment. Third, a contract period optimization model for WSMC projects was built with the objective of maximizing WSSC profit net present value (NPV) and with constraints of water user incentive constraint, WSSC rational constraint, and minimal cooperation duration. Finally, a WSMC project case in China was studied and the solutions were compared with traditional model. The results showed that the optimal contract period in this paper was 3 years longer than the one in traditional model. Meanwhile, the measured equipment renewal cycle was 7 years and it was less than the estimated economic lifetime. Based on the 9-year contract, the water user's revenue was higher with 55.8% than original contract, while WSSC's profit loss was lower with 60.8% than the traditional results. The findings reveal that the implementation of an equipment replacement plan considerably boost the revenue of participants and assist WSSC in obtaining more profit.
引用
收藏
页码:5725 / 5741
页数:17
相关论文
共 50 条
  • [11] The design of the industry chain model of energy saving service based on Energy Management Contract
    Du Juan
    Song Junbiao
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ENGINEERING SCIENCE AND MANAGEMENT (ESM), 2016, 62 : 131 - 135
  • [12] Research on IT Project Contract Model
    Zheng Chan
    Feng Jingchun
    Li Ming
    ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL II, PROCEEDINGS, 2009, : 172 - 175
  • [13] Benefit distribution of guaranteed water saving management contract based on principal-agent theory
    Wang, Xiaosheng
    Li, Ran
    Li, Wei
    Liu, Zhaoxing
    INTERNATIONAL JOURNAL OF GENERAL SYSTEMS, 2024, 53 (04) : 426 - 452
  • [14] Energy Management Contract Period Design
    Cui, Herui
    Zhang, Ruyu
    Xuan, Zhaowei
    EMERGING RESEARCH IN WEB INFORMATION SYSTEMS AND MINING, 2011, 238 : 137 - 143
  • [15] The Practice and Research for Total Contract Management Mode of Land Replacement-Total Contract Management Experience of Weifang Cultural Arts Center Project
    Xiao, Hua
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2282 - 2288
  • [16] MAINTENANCE CONTRACT MODEL FOR COMPLEX ASSET/EQUIPMENT
    Rahman, Anisur
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2014, 21 (01):
  • [17] Research on International Project Contract Management and Claim
    Li, Xiaoliang
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON EDUCATION, SPORTS, ARTS AND MANAGEMENT ENGINEERING (ICESAME 2017), 2017, 123 : 814 - 817
  • [18] Cooperation and Contract Design in Project Management with Outsourcing
    Cai, Xiaoqiang
    Hall, Nicholas G.
    Wang, Siyi
    Zhang, Feng
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2023, 32 (01) : 34 - 70
  • [19] Research on Performance Contract Mechanism in Project Management
    Sai Yunxiu
    Song Lihui
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 300 - +
  • [20] Cooperation and Contract Design in Project Management with Outsourcing
    Xiaoqiang Cai
    Nicholas G. Hall
    Siyi Wang
    Feng Zhang
    Journal of Systems Science and Systems Engineering, 2023, 32 : 34 - 70