Bargaining-Based Profit Allocation Model for Fixed Return Investment Water-Saving Management Contract

被引:0
|
作者
Liu, Shize [1 ]
Wang, Xiaosheng [2 ]
Li, Wei [3 ]
机构
[1] Hebei Univ Engn, Sch Management Engn & Business, Handan 056038, Peoples R China
[2] Hebei Univ Engn, Sch Math & Phys, Handan 056038, Peoples R China
[3] Hebei Univ Engn, Sch Water Conservancy & Hydroelect Power, Handan 056038, Peoples R China
基金
中国国家自然科学基金;
关键词
water-saving management contract; fixed return investment model; profit allocation; bargaining theory; PERFECT EQUILIBRIUM;
D O I
10.3390/axioms11120712
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
Fixed Return Investment (FRI) is one of the main operating modes of a Water-Saving Management Contract (WSMC). Aiming at the critical profit allocation of FRI WSMC projects, a new profit allocation model based on bargaining theory is proposed. First, the net present value is adopted to determine the profit interval to be allocated. Second, the bargaining process is divided into two levels. The first-level bargaining process is between a water user and an alliance, which consists of a Water Service Company (WSCO) and a financial institution. The second-level bargaining process is between the WSCO and the financial institution. Given the imbalance caused by offering first, the number of bargaining stages and sunk cost are introduced, and the equilibrium offers of the two parties in different bargaining stages are determined by using backward induction and mathematical induction. According to the feature that the number of bargaining stages is an integer in practice, the deterrence discount factors are introduced to redistribute the remaining part, and sixteen situations of profit allocation among participants are given. Third, the model analysis shows that the profit allocation of participants is closely related to the minimum profit requirements, deterrence discount factors, the number of bargaining stages, and sunk cost. Finally, the effectiveness of the model and the influence of various factors on profit allocation are verified by an example. The example shows that in the early stage of FRI WSMC, the water users enjoy more profits.
引用
收藏
页数:25
相关论文
共 50 条
  • [1] Profit allocation of benefit-sharing water saving management contract based on bargaining model
    Wang X.
    Hu H.
    Liu X.
    An X.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2020, 40 (09): : 2418 - 2426
  • [2] Benefit Allocation in Shared Water-Saving Management Contract Projects Based on Modified Expected Shapley Value
    Xinxin Liu
    Xiaosheng Wang
    Haiying Guo
    Xiaojie An
    Water Resources Management, 2021, 35 : 39 - 62
  • [3] Benefit Allocation in Shared Water-Saving Management Contract Projects Based on Modified Expected Shapley Value
    Liu, Xinxin
    Wang, Xiaosheng
    Guo, Haiying
    An, Xiaojie
    WATER RESOURCES MANAGEMENT, 2021, 35 (01) : 39 - 62
  • [4] Water-Saving Revenue Guarantee Optimization in Water Saving Management Contract Based on Simulation Method
    Li, Wei
    Wang, Xiaosheng
    Li, Ran
    WATER RESOURCES MANAGEMENT, 2023, 37 (13) : 5127 - 5146
  • [5] Water-Saving Revenue Guarantee Optimization in Water Saving Management Contract Based on Simulation Method
    Wei Li
    Xiaosheng Wang
    Ran Li
    Water Resources Management, 2023, 37 : 5127 - 5146
  • [6] Optimal allocation of regional water resources under water saving management contract
    Xiaojie An
    Xiaosheng Wang
    Hao Hu
    Shujiang Pang
    Journal of Data, Information and Management, 2021, 3 (4): : 281 - 296
  • [7] The Water-Saving Management Contract in China: Current Status, Existing Problems, and Countermeasure Suggestions
    Wang, Wei
    Ren, Liang
    Deng, Chenning
    Wang, Qianyang
    Yu, Jingshan
    WATER, 2022, 14 (19)
  • [8] Physics-based model for a water-saving greenhouse
    Speetjens, S. L.
    Stigter, J. D.
    van Straten, G.
    BIOSYSTEMS ENGINEERING, 2010, 105 (02) : 149 - 159
  • [9] A Contract Period Optimization Model for Water Saving Management Contract Project Based on Equipment Replacement
    Wei Li
    Xiaosheng Wang
    Qian Zhang
    Water Resources Management, 2023, 37 : 5725 - 5741
  • [10] A Contract Period Optimization Model for Water Saving Management Contract Project Based on Equipment Replacement
    Li, Wei
    Wang, Xiaosheng
    Zhang, Qian
    WATER RESOURCES MANAGEMENT, 2023, 37 (14) : 5725 - 5741