IS YOUR MASTER PRODUCTION SCHEDULE FEASIBLE?

被引:0
|
作者
Conlon, James R.
机构
来源
关键词
INVENTORY CONTROL - OPERATIONS RESEARCH;
D O I
暂无
中图分类号
学科分类号
摘要
With the coming of material requirements planning (MRP) systems, the master production schedule (MPS) has become a very important subject. The MPS drives the MRP system. In order for the MPS to properly drive MRP, it must be realistic. More MRP systems have failed because of overly optimistic schedules than any other reason. Even shops without MRP systems must have a good MPS to exercise proper production control. The purpose of this article is to present some techniques which can be used as a check on the MPS to insure feasibility. Feasibility usually involves either plant capacity and/or product mix constraints. This article looks at both of these constraints and it also considers feasibility in a job shop environment.
引用
收藏
页码:56 / 63
相关论文
共 50 条
  • [11] MULTI-OBJECTIVE MASTER PRODUCTION SCHEDULE FOR BALANCED PRODUCTION OF MANUFACTURERS
    Wang, C.
    Yang, B.
    Wang, H. Q.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (04) : 678 - 688
  • [12] Interface between the production plan and the master production schedule in assembly environments
    Moya Navarro, Marcos
    Sanchez Brenes, Magaly
    TECNOLOGIA EN MARCHA, 2012, 25 (03): : 101 - 111
  • [13] Planning and replanning the master production schedule under demand uncertainty
    Tang, O
    Grubbström, RW
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 78 (03) : 323 - 334
  • [14] Mathematical Model of Master Production Schedule for Kalak Refinery Plant
    Sadiq, Shereen S.
    Abdulazeez, Adnan Mohsin
    Haron, Habibollah
    NEW TRENDS IN INTELLIGENT SOFTWARE METHODOLOGIES, TOOLS AND TECHNIQUES (SOMET_18), 2018, 303 : 332 - 344
  • [15] Joint optimization of a master production schedule and a preventive maintenance policy
    Gehan, Martin
    Castanier, Bruno
    Lemoine, David
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 302 - 308
  • [16] Smart Master Production Schedule for the Supply Chain: A Conceptual Framework
    Serrano-Ruiz, Julio C.
    Mula, Josefa
    Poler, Raul
    COMPUTERS, 2021, 10 (12)
  • [17] The use of two levels of the master schedule for the supply and production planning
    Fertsch, Michal
    2016 INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH - REGIONAL CONFERENCE AFRICA, EUROPE AND THE MIDDLE EAST (ICPR-AEM 2016) AND 4TH INTERNATIONAL CONFERENCE ON QUALITY AND INNOVATION IN ENGINEERING AND MANAGEMENT (QIEM 2016), 2016, : 293 - 296
  • [18] Rolling horizon master production schedule performance: a policy analysis
    Venkataraman, R
    D'Itri, MP
    PRODUCTION PLANNING & CONTROL, 2001, 12 (07) : 669 - 679
  • [19] Mathematical Modeling of Master Production Schedule with Campaign Planning Constraints
    Devanand, R.
    Shekhar, Tushar
    Mahajan, Ashutosh
    Hemachandra, N.
    2021 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM21), 2021, : 964 - 968
  • [20] Replanning the master production schedule for a capacity-constrained job shop
    Yang, KK
    Jacobs, FR
    DECISION SCIENCES, 1999, 30 (03) : 719 - 748