IS YOUR MASTER PRODUCTION SCHEDULE FEASIBLE?

被引:0
|
作者
Conlon, James R.
机构
来源
关键词
INVENTORY CONTROL - OPERATIONS RESEARCH;
D O I
暂无
中图分类号
学科分类号
摘要
With the coming of material requirements planning (MRP) systems, the master production schedule (MPS) has become a very important subject. The MPS drives the MRP system. In order for the MPS to properly drive MRP, it must be realistic. More MRP systems have failed because of overly optimistic schedules than any other reason. Even shops without MRP systems must have a good MPS to exercise proper production control. The purpose of this article is to present some techniques which can be used as a check on the MPS to insure feasibility. Feasibility usually involves either plant capacity and/or product mix constraints. This article looks at both of these constraints and it also considers feasibility in a job shop environment.
引用
收藏
页码:56 / 63
相关论文
共 50 条
  • [21] Factors influencing rolling horizon master production schedule cost performance
    Venkataraman, R
    D'Itri, M
    DECISION SCIENCES INSTITUTE 1998 PROCEEDINGS, VOLS 1-3, 1998, : 1471 - 1472
  • [22] Effect of freezing the master production schedule on cost in multilevel MRP systems
    Kadipasaoglu, Sukran N.
    Production and Inventory Management Journal, 1995, 36 (03): : 30 - 36
  • [23] A master production schedule warning approach for cement equipment manufacturing enterprises
    Sun, L. B.
    Guo, S. S.
    Tao, S. Q.
    Li, Y. B.
    Du, B. G.
    SCIENTIA IRANICA, 2014, 21 (03) : 1120 - 1127
  • [24] Impact of mass customization on bill of materials structure and master production schedule
    Chatras, Clément
    Giard, Vincent
    Sali, Mustapha
    Journal Europeen des Systemes Automatises, 2016, 49 (01): : 55 - 91
  • [25] FREEZING THE MASTER PRODUCTION SCHEDULE UNDER ROLLING PLANNING-HORIZONS
    SRIDHARAN, V
    BERRY, WL
    UDAYABHANU, V
    MANAGEMENT SCIENCE, 1987, 33 (09) : 1137 - 1149
  • [26] Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions
    Venkataraman, R
    Smith, SB
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (06) : 1517 - 1537
  • [27] THE DYNAMICS OF HEDGING THE MASTER SCHEDULE
    GUERRERO, HH
    BAKER, KR
    SOUTHARD, MH
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (06) : 1475 - 1483
  • [28] Freezing the master production schedule under single resource constraint and demand uncertainty
    Xie, JX
    Zhao, XD
    Lee, TS
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 83 (01) : 65 - 84
  • [29] Study on Master Production Schedule in Manufacturing System for Medium and Small Manufacture Enterprises
    Lu, Xiaohong
    Wu, Wenyi
    Han, Pengzhuo
    Li, Guangjun
    Wei, Jie
    ADVANCED RESEARCH ON APPLIED MECHANICS AND MANUFACTURING SYSTEM, 2013, 252 : 349 - +
  • [30] Determination of master production schedule replanning frequency for various forecast window intervals
    Nathan, J
    Venkataraman, R
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1998, 18 (7-8) : 767 - +