A master production schedule warning approach for cement equipment manufacturing enterprises

被引:0
|
作者
Sun, L. B. [1 ]
Guo, S. S. [1 ]
Tao, S. Q. [1 ,2 ]
Li, Y. B. [1 ]
Du, B. G. [1 ]
机构
[1] Wuhan Univ Technol, Sch Mech & Elect Engn, Wuhan 430070, Peoples R China
[2] Wuhan Tech Coll Commun, Dept Mech & Elect Engn, Wuhan 430065, Peoples R China
基金
中国国家自然科学基金;
关键词
MPS; MBOM; Yellow warning; Red warning; BASE;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Reducing product delivery time is a key factor for enterprises in increasing their core competitiveness. In order to resolve problems, including lack of a warning and monitoring system for Master Production Schedules (MPS) in cement equipment manufacturing enterprises, we propose a warning mechanism based on theoretical finish percentage and actual finish percentage. First, an MPS model, based on the product Manufacturing Bill Of the Material (MBOM), is proposed. Second, we present an approach for generating planned time, actual time, actual finish percentage and theoretical finish percentage, and yellow and red warnings are introduced to evaluate whether the production plan is normal or not. Finally, we use an example to illustrate the proposed algorithm process. Experimental results have shown that the proposed approach is able to support MPS warning. (C) 2014 Sharif University of Technology. All rights reserved.
引用
收藏
页码:1120 / 1127
页数:8
相关论文
共 50 条
  • [1] Study on Master Production Schedule in Manufacturing System for Medium and Small Manufacture Enterprises
    Lu, Xiaohong
    Wu, Wenyi
    Han, Pengzhuo
    Li, Guangjun
    Wei, Jie
    ADVANCED RESEARCH ON APPLIED MECHANICS AND MANUFACTURING SYSTEM, 2013, 252 : 349 - +
  • [2] Plan Management for Production Schedule in Aviation Manufacturing Enterprises
    Wang Qingjun
    Wu Jingtai
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MANAGEMENT, COMPUTER AND EDUCATION INFORMATIZATION, 2015, 25 : 200 - 203
  • [3] Application of Multi-layer Production Warning Approach for Building-Material-Equipment Manufacturing
    Wang Lei
    Guo Chen
    Guo Shunsheng
    PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I & II, 2017, : 835 - 839
  • [4] Design of an integrated production management mode for equipment manufacturing enterprises
    Xue, Dongjuan
    Liu, Xiaobing
    Wang, Xiao
    Bai, Zhaoyang
    7TH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED INDUSTRIAL DESIGN & CONCEPTUAL DESIGN, 2006, : 300 - +
  • [5] Study on master production schedule to the manufacture enterprises of lot production and single-unit small lot production
    Yang, H
    Li, Y
    Lv, ZL
    PROCEEDINGS OF 2002 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2002, : 758 - 762
  • [6] DETERMINING THE MASTER PRODUCTION SCHEDULE
    OGRADY, PJ
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1982, 33 (07) : 658 - 658
  • [7] Management Control and Early Warning Methods of Project Progress of Building Material Equipment Manufacturing Enterprises
    Fan, Tao
    Zhang, Jin
    Xia, Wanyang
    PROCEEDINGS OF THE 39TH CHINESE CONTROL CONFERENCE, 2020, : 5970 - 5976
  • [8] An outsourcing service selection method using ANN and SFLA algorithms for cement equipment manufacturing enterprises in cloud manufacturing
    Lei Wang
    Chen Guo
    Yibing Li
    Baigang Du
    Shunsheng Guo
    Journal of Ambient Intelligence and Humanized Computing, 2019, 10 : 1065 - 1079
  • [9] An outsourcing service selection method using ANN and SFLA algorithms for cement equipment manufacturing enterprises in cloud manufacturing
    Wang, Lei
    Guo, Chen
    Li, Yibing
    Du, Baigang
    Guo, Shunsheng
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2019, 10 (03) : 1065 - 1079
  • [10] Modeling of the Master Production Schedule for the Digital Transition of Manufacturing SMEs in the Context of Industry 4.0
    Tobon-Valencia, Estefania
    Lamouri, Samir
    Pellerin, Robert
    Moeuf, Alexandre
    SUSTAINABILITY, 2022, 14 (19)