A master production schedule warning approach for cement equipment manufacturing enterprises

被引:0
|
作者
Sun, L. B. [1 ]
Guo, S. S. [1 ]
Tao, S. Q. [1 ,2 ]
Li, Y. B. [1 ]
Du, B. G. [1 ]
机构
[1] Wuhan Univ Technol, Sch Mech & Elect Engn, Wuhan 430070, Peoples R China
[2] Wuhan Tech Coll Commun, Dept Mech & Elect Engn, Wuhan 430065, Peoples R China
基金
中国国家自然科学基金;
关键词
MPS; MBOM; Yellow warning; Red warning; BASE;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Reducing product delivery time is a key factor for enterprises in increasing their core competitiveness. In order to resolve problems, including lack of a warning and monitoring system for Master Production Schedules (MPS) in cement equipment manufacturing enterprises, we propose a warning mechanism based on theoretical finish percentage and actual finish percentage. First, an MPS model, based on the product Manufacturing Bill Of the Material (MBOM), is proposed. Second, we present an approach for generating planned time, actual time, actual finish percentage and theoretical finish percentage, and yellow and red warnings are introduced to evaluate whether the production plan is normal or not. Finally, we use an example to illustrate the proposed algorithm process. Experimental results have shown that the proposed approach is able to support MPS warning. (C) 2014 Sharif University of Technology. All rights reserved.
引用
收藏
页码:1120 / 1127
页数:8
相关论文
共 50 条
  • [21] Carbon track of cement production enterprises
    Muravyova E.A.
    Kulakova E.S.
    SOCAR Proceedings, 2022, 2022 : 53 - 63
  • [22] Multi-objective production planning model for equipment manufacturing enterprises with multiple uncertainties in demand
    Liu, Y. F.
    Zhang, Q. S.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2018, 13 (04): : 429 - 441
  • [23] A methodology for evaluating the manufacturing ability of equipment in virtual enterprises
    Wang, H. H.
    Zhou, Z. D.
    Chen, Y. P.
    Ong, S. K.
    Nee, A. Y. C.
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2006, 19 (04) : 339 - 349
  • [24] On the Evaluation System for Chinese Communication Equipment Manufacturing Enterprises
    He Shuping
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 324 - 328
  • [25] Accident Warning and Fast Reaction in Emergency Management of Manufacturing Enterprises
    Zhou Huiwen
    MECHANICAL, MATERIALS AND MANUFACTURING ENGINEERING, PTS 1-3, 2011, 66-68 : 978 - 982
  • [26] FREEZING THE MASTER PRODUCTION SCHEDULE - IMPLICATIONS FOR FILL RATE
    SRIDHARAN, V
    LAFORGE, RL
    DECISION SCIENCES, 1994, 25 (03) : 461 - 469
  • [27] Revising the master production schedule in sequence dependent processes
    Hill, JA
    Berry, WL
    Schilling, DA
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (09) : 2021 - 2035
  • [28] FREEZING THE MASTER PRODUCTION SCHEDULE UNDER DEMAND UNCERTAINTY
    SRIDHARAN, V
    BERRY, WL
    DECISION SCIENCES, 1990, 21 (01) : 97 - 120
  • [29] Revising the master production schedule in a HPP framework context
    Omar, M. K.
    Bennell, J. A.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (20) : 5857 - 5878
  • [30] Planning of Master Production Schedule at PT Semen Padang
    Ishak, Aulia
    Tarigan, Ukurta
    Dwinitha, A.
    2ND INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING (ICI&ME 2020), 2020, 1003