The use of two levels of the master schedule for the supply and production planning

被引:0
|
作者
Fertsch, Michal [1 ]
机构
[1] Poznan Univ Tech, Fac Management Engn, Strzelecka St 1, PL-60965 Poznan, Poland
关键词
two levels of the master schedule; production planning; supply planning;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper is to demonstrate the solution dedicated to the marine engines producer to improve their production and delivery planning. The core activity of the company is the production of marine engines. The company also produces spare parts for marine engines and provides services in field of manufacturing steel products. The issues in production and supply planning are connected with treatment of parts on strategic machines and service production. The proposed solution assumes the use of two levels of master schedule. The core of the solution is to plan the treatment of the parts on strategic machines, the spare parts and the services separately from the production of parts that are not produced on the strategic machines and marine engine assembly. The first level of the master schedule is dedicated for the assembly planning. This level provides the company with information needed for the production planning of parts not treated on strategic machines and about delivery dates of materials used for this production, and parts needed for the assembly of marine engine. It also provides the information for the second level of master schedule about the optimal dates of production of parts treated on the strategic machines. The second level of master schedule is used for the scheduling the works on the strategic machines, production of spare parts and service production and provides the company with data needed for delivery planning of the materials for this production.
引用
收藏
页码:293 / 296
页数:4
相关论文
共 50 条
  • [1] Planning of Master Production Schedule at PT Semen Padang
    Ishak, Aulia
    Tarigan, Ukurta
    Dwinitha, A.
    [J]. 2ND INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING (ICI&ME 2020), 2020, 1003
  • [2] The two level master production schedule and planning bills in a just in time MRP context
    Lamouri, S
    Thomas, A
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 64 (1-3) : 409 - 415
  • [3] Smart Master Production Schedule for the Supply Chain: A Conceptual Framework
    Serrano-Ruiz, Julio C.
    Mula, Josefa
    Poler, Raul
    [J]. COMPUTERS, 2021, 10 (12)
  • [4] Planning and replanning the master production schedule under demand uncertainty
    Tang, O
    Grubbström, RW
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 78 (03) : 323 - 334
  • [5] Mathematical Modeling of Master Production Schedule with Campaign Planning Constraints
    Devanand, R.
    Shekhar, Tushar
    Mahajan, Ashutosh
    Hemachandra, N.
    [J]. 2021 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM21), 2021, : 964 - 968
  • [6] FREEZING THE MASTER PRODUCTION SCHEDULE UNDER ROLLING PLANNING-HORIZONS
    SRIDHARAN, V
    BERRY, WL
    UDAYABHANU, V
    [J]. MANAGEMENT SCIENCE, 1987, 33 (09) : 1137 - 1149
  • [7] DETERMINING THE MASTER PRODUCTION SCHEDULE
    OGRADY, PJ
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1982, 33 (07) : 658 - 658
  • [8] MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING-HORIZONS
    SRIDHARAN, SV
    BERRY, WL
    UDAYABHANU, V
    [J]. DECISION SCIENCES, 1988, 19 (01) : 147 - 166
  • [9] Master production schedule time interval strategies in make-to-order supply chains
    Robinson, E. Powell, Jr.
    Sahin, Funda
    Gao, Li-Lian
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (07) : 1933 - 1954
  • [10] A MODEL TO ESTIMATE SERVICE LEVELS WHEN A PORTION OF THE MASTER PRODUCTION SCHEDULE IS FROZEN
    SRIDHARAN, V
    LAFORGE, RL
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (05) : 477 - 486