Mathematical Modeling of Master Production Schedule with Campaign Planning Constraints

被引:0
|
作者
Devanand, R. [1 ]
Shekhar, Tushar [2 ]
Mahajan, Ashutosh [1 ]
Hemachandra, N. [1 ]
机构
[1] Indian Inst Technol, Ind Engn & Operat Res, Mumbai, Maharashtra, India
[2] Blue Yonder, Prod Dev Team, Bangalore, Karnataka, India
关键词
campaign planning; master production schedule; master planning; integer programming; PLANTS;
D O I
10.1109/IEEM50564.2021.9672996
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Campaign planning plays an important role in the batch production of varieties of products from the same assembly line in manufacturing industries. Its goal is to plan activities in a way so as to reduce unnecessary production overheads, such as changeover time, inventory, etc., while at the same time improving demand satisfaction. Master production schedule (MPS) is one of the main components in the master planning process in manufacturing. It prepares a detailed plan for individual products produced in each period. For some process industries that manufacture their products on production lines, MPS needs to consider campaign planning as it impacts key performance indicators. We propose a mathematical formulation for MPS that takes into account campaign planning constraints. We apply this model to a tire industry and compare it to an existing heuristic.
引用
收藏
页码:964 / 968
页数:5
相关论文
共 50 条
  • [1] Planning of Master Production Schedule at PT Semen Padang
    Ishak, Aulia
    Tarigan, Ukurta
    Dwinitha, A.
    [J]. 2ND INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING (ICI&ME 2020), 2020, 1003
  • [2] Mathematical Model of Master Production Schedule for Kalak Refinery Plant
    Sadiq, Shereen S.
    Abdulazeez, Adnan Mohsin
    Haron, Habibollah
    [J]. NEW TRENDS IN INTELLIGENT SOFTWARE METHODOLOGIES, TOOLS AND TECHNIQUES (SOMET_18), 2018, 303 : 332 - 344
  • [3] Planning and replanning the master production schedule under demand uncertainty
    Tang, O
    Grubbström, RW
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 78 (03) : 323 - 334
  • [4] The use of two levels of the master schedule for the supply and production planning
    Fertsch, Michal
    [J]. 2016 INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH - REGIONAL CONFERENCE AFRICA, EUROPE AND THE MIDDLE EAST (ICPR-AEM 2016) AND 4TH INTERNATIONAL CONFERENCE ON QUALITY AND INNOVATION IN ENGINEERING AND MANAGEMENT (QIEM 2016), 2016, : 293 - 296
  • [5] FREEZING THE MASTER PRODUCTION SCHEDULE UNDER ROLLING PLANNING-HORIZONS
    SRIDHARAN, V
    BERRY, WL
    UDAYABHANU, V
    [J]. MANAGEMENT SCIENCE, 1987, 33 (09) : 1137 - 1149
  • [6] DETERMINING THE MASTER PRODUCTION SCHEDULE
    OGRADY, PJ
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1982, 33 (07) : 658 - 658
  • [7] MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING-HORIZONS
    SRIDHARAN, SV
    BERRY, WL
    UDAYABHANU, V
    [J]. DECISION SCIENCES, 1988, 19 (01) : 147 - 166
  • [8] ORDER PROMISING AND THE MASTER PRODUCTION SCHEDULE
    MCCLELLAND, MK
    [J]. DECISION SCIENCES, 1988, 19 (04) : 858 - 879
  • [9] PLANNING OF CONSTRUCTION SCHEDULE WITH FLEXIBLE CONSTRAINTS
    Kulejewski, Janusz
    [J]. MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 10TH INTERNATIONAL CONFERENCE 2010, VOL I, 2010, : 442 - 445
  • [10] The two level master production schedule and planning bills in a just in time MRP context
    Lamouri, S
    Thomas, A
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 64 (1-3) : 409 - 415