The two level master production schedule and planning bills in a just in time MRP context

被引:11
|
作者
Lamouri, S [1 ]
Thomas, A [1 ]
机构
[1] ENSGSI, AFAV Expert, CFPIM, F-54000 Nancy, France
关键词
manufacturing resource planning; master production schedule; just in time;
D O I
10.1016/S0925-5273(99)00077-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The evolution of industrial firms has recently passed from a strong growth phase to a phase where there is a greater complexification of products: widening the range of products in catalogues, diversification and personalization of models. The current trend is to use, with production management techniques such as classical manufacturing resource planning (MRP2), the concept of two level master production schedule (MPS), using planning bills with percentages indicating the probability that such or such an option will be used. This necessitates, however, the implementation of a rigorous approach to continuous improvement using just in time (JiT) and total quality (TQ) concepts. In the first part of our paper we discuss principles of operating two level MPS; secondly, we analyze these effects on management and organization. Our paper is based on a case study. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:409 / 415
页数:7
相关论文
共 50 条
  • [1] The use of two levels of the master schedule for the supply and production planning
    Fertsch, Michal
    [J]. 2016 INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH - REGIONAL CONFERENCE AFRICA, EUROPE AND THE MIDDLE EAST (ICPR-AEM 2016) AND 4TH INTERNATIONAL CONFERENCE ON QUALITY AND INNOVATION IN ENGINEERING AND MANAGEMENT (QIEM 2016), 2016, : 293 - 296
  • [2] Revising the master production schedule in a HPP framework context
    Omar, M. K.
    Bennell, J. A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (20) : 5857 - 5878
  • [3] Planning of Master Production Schedule at PT Semen Padang
    Ishak, Aulia
    Tarigan, Ukurta
    Dwinitha, A.
    [J]. 2ND INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING (ICI&ME 2020), 2020, 1003
  • [4] Incorporating maintenance activities into production planning; Integration at the master schedule versus material requirements level
    Rishel, TD
    Christy, DP
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (02) : 421 - 446
  • [5] Planning and replanning the master production schedule under demand uncertainty
    Tang, O
    Grubbström, RW
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 78 (03) : 323 - 334
  • [6] Mathematical Modeling of Master Production Schedule with Campaign Planning Constraints
    Devanand, R.
    Shekhar, Tushar
    Mahajan, Ashutosh
    Hemachandra, N.
    [J]. 2021 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM21), 2021, : 964 - 968
  • [7] SCHEDULE BASED MRP - AN INTEGRATED APPROACH TO PRODUCTION SCHEDULING AND MATERIAL REQUIREMENTS PLANNING
    HASTINGS, NAJ
    MARSHALL, P
    WILLIS, RJ
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1982, 33 (11) : 1021 - 1029
  • [8] PLANNING FOR JUST-IN-TIME PRODUCTION
    CHAHARBAGHI, K
    DAVIES, BL
    MINETT, SC
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1989, 2 (05) : 268 - 274
  • [9] FREEZING THE MASTER PRODUCTION SCHEDULE UNDER ROLLING PLANNING-HORIZONS
    SRIDHARAN, V
    BERRY, WL
    UDAYABHANU, V
    [J]. MANAGEMENT SCIENCE, 1987, 33 (09) : 1137 - 1149
  • [10] FORMALIZATION OF THE MASTER PRODUCTION SHEDULE FORMATION TASK IN THE MRP II PLANNING SYSTEM
    Novinskyi, V. P.
    Popenko, V. D.
    [J]. RADIO ELECTRONICS COMPUTER SCIENCE CONTROL, 2024, (02) : 167 - 180