The two level master production schedule and planning bills in a just in time MRP context

被引:11
|
作者
Lamouri, S [1 ]
Thomas, A [1 ]
机构
[1] ENSGSI, AFAV Expert, CFPIM, F-54000 Nancy, France
关键词
manufacturing resource planning; master production schedule; just in time;
D O I
10.1016/S0925-5273(99)00077-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The evolution of industrial firms has recently passed from a strong growth phase to a phase where there is a greater complexification of products: widening the range of products in catalogues, diversification and personalization of models. The current trend is to use, with production management techniques such as classical manufacturing resource planning (MRP2), the concept of two level master production schedule (MPS), using planning bills with percentages indicating the probability that such or such an option will be used. This necessitates, however, the implementation of a rigorous approach to continuous improvement using just in time (JiT) and total quality (TQ) concepts. In the first part of our paper we discuss principles of operating two level MPS; secondly, we analyze these effects on management and organization. Our paper is based on a case study. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:409 / 415
页数:7
相关论文
共 50 条
  • [31] LEVEL SCHEDULES FOR MIXED-MODEL ASSEMBLY LINES IN JUST-IN-TIME PRODUCTION SYSTEMS
    KUBIAK, W
    SETHI, S
    [J]. MANAGEMENT SCIENCE, 1991, 37 (01) : 121 - 122
  • [32] SCHEDULING MIXED-MODEL MULTI-LEVEL JUST-IN-TIME PRODUCTION SYSTEMS
    MILTENBURG, J
    SINNAMON, G
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (09) : 1487 - 1509
  • [33] LEVEL SCHEDULES FOR MIXED-MODEL ASSEMBLY LINES IN JUST-IN-TIME PRODUCTION SYSTEMS
    MILTENBURG, J
    [J]. MANAGEMENT SCIENCE, 1989, 35 (02) : 192 - 207
  • [34] Acceptability of family planning in a changing context in Uganda: a realist evaluation at two time points
    Krishnaratne, Shari
    Hoyt, Jenna
    Hamon, Jessie K.
    Ariko, Angela Barbra
    Atayo, Carol
    Morukileng, Job
    Spilotros, Nathaly
    Webster, Jayne
    [J]. BMJ OPEN, 2022, 12 (04):
  • [35] Earliness-tardiness production planning for just-in-time manufacturing: A unifying approach by goal programming
    Li, Lei
    Fonseca, Daniel J.
    Chen, Der-San
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (01) : 508 - 515
  • [36] Data envelopment analysis approaches for two-level production and distribution planning problems
    Nishizaki, Ichiro
    Hayashida, Tomohiro
    Sekizaki, Shinya
    Okabe, Junya
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 300 (01) : 255 - 268
  • [37] Data Envelopment Analysis Approaches for Multiperiod Two-Level Production and Distribution Planning Problems
    Hayashida, Tomohiro
    Nishizaki, Ichiro
    Sekizaki, Shinya
    Okabe, Junya
    [J]. MATHEMATICS, 2023, 11 (21)
  • [38] Two-Level Master-Slave RFID Networks Planning via Hybrid Multiobjective Artificial Bee Colony Optimizer
    Ma, Lianbo
    Wang, Xingwei
    Huang, Min
    Lin, Zhiwei
    Tian, Liwei
    Chen, Hanning
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2019, 49 (05): : 861 - 880
  • [39] Two-Stage Genetic Algorithm for Scheduling Stochastic Unrelated Parallel Machines in a Just-in-Time Manufacturing Context
    Cao, Zhengcai
    Lin, Chengran
    Zhou, MengChu
    Zhou, Chuanguang
    Sedraoui, Khaled
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2023, 20 (02) : 936 - 949
  • [40] A two-level advanced production planning and scheduling model for RFID-enabled ubiquitous manufacturing
    Zhong, Ray Y.
    Huang, George Q.
    Lan, Shulin
    Dai, Q. Y.
    Zhang, T.
    Xu, Chen
    [J]. ADVANCED ENGINEERING INFORMATICS, 2015, 29 (04) : 799 - 812