HEADRACE AND POWER-SHAFT COMPLEX FOR THE DEHAR PROJECT.

被引:0
|
作者
Datta, O.P.
机构
来源
International Water Power and Dam Construction | 1975年 / 27卷 / 01期
关键词
HEADRACE TUNNELS;
D O I
暂无
中图分类号
学科分类号
摘要
The author outlines the major features relating to the headrace complex for the Dehar power plant, part of stage one of the Beas hydro development currently under construction in northern India. The 13 km-long Dehar headrace tunnel and penstock system begins at a 370 km-capacity balancing reservoir, the pond levels of which fluctuate between el. 842. 47 and 833. 32. The system comprises the headrace tunnel, the surge shaft with a bypass, and the penstocks leading to Dehar power plant, making available a gross head of about 345 m for a 1000 MW power installation.
引用
收藏
页码:29 / 33
相关论文
共 30 条
  • [11] Elites and power networks around the regenerating project. Cartagena 1874-1892
    Chavez, Grey Verbel
    TALLER DE LA HISTORIA, 2011, 3 (03): : 41 - 62
  • [12] Evolution of the Salto of Jandula project. Process of integration of the hydroelectric power station in the dam
    Carbajal-Ballell, N.
    INFORMES DE LA CONSTRUCCION, 2019, 71 (554)
  • [13] Use of isolated inbred human populations in genetic epidemiology of complex traits: the Carlantino project.
    Specchia, C
    D'Adamo, P
    Carella, M
    Zelante, L
    Bertoldo, F
    D'Eustacchio, A
    Ferrara, A
    Molinari, A
    Gasparini, P
    AMERICAN JOURNAL OF HUMAN GENETICS, 2003, 73 (05) : 399 - 399
  • [14] MODIFICATION OF GLASER PROJECT. NEW THERMAL CYCLE FOR ORBITAL SOLAR ELECTRIC POWER STATION
    Ludanov, K. I.
    SPACE SCIENCE AND TECHNOLOGY-KOSMICNA NAUKA I TEHNOLOGIA, 2009, 15 (01): : 62 - 67
  • [15] Making Ubumwe: Power, State and Camps in Rwanda's Unity-Building Project.
    MacArthur, Julie
    MacAulay, Alison
    AFRICAN STUDIES REVIEW, 2017, 60 (03) : 221 - 229
  • [16] Synthesis and ligand isomerization kinetics of an allyl-molybdenum carbonyl complex: An undergraduate laboratory project.
    Fischer, PJ
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2004, 227 : U675 - U676
  • [17] ETHNOGRAPHY OF A NORTH-SOUTH RESEARCH PROJECT. FROM EPISTEMOLOGICAL DIFFERENCES TO ETHICAL CHALLENGES AND POWER RELATIONS
    McKenzie, Tsering
    REVUE D ANTHROPOLOGIE DES CONNAISSANCES, 2019, 13 (02): : 425 - 454
  • [18] RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn
    Bareiss, J
    Buck, P
    Matschecko, B
    Jovanovic, A
    Balos, D
    Perunicic, M
    INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2004, 81 (10-11) : 807 - 813
  • [19] Project of Experimental Complex for Power System Stability Studies
    Rangelov, Yulian
    Nikolaev, Nikolay
    Kamenov, Yoncho
    Gerasimov, Krum
    PROCEEDINGS OF THE SECOND INTERNATIONAL SCIENTIFIC CONFERENCE INTELLIGENT INFORMATION TECHNOLOGIES FOR INDUSTRY (IITI'17), VOL 2, 2018, 680 : 396 - 402
  • [20] Environmental Aspects of a Pilot Power Complex in Project Breakthrough
    Aleksakhin, R. M.
    Spirin, E. V.
    Solomatin, V. M.
    Spiridonov, S. I.
    ATOMIC ENERGY, 2016, 120 (06) : 380 - 387