Evolution of the Salto of Jandula project. Process of integration of the hydroelectric power station in the dam

被引:0
|
作者
Carbajal-Ballell, N. [1 ]
机构
[1] Univ Seville, Seville, Spain
关键词
Hydroelectric power station; Fernandez-Shaw; futurism; Jandula; Mendoza; Mergemor; dam;
D O I
10.3989/ic.63725
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Salto of Jandula is one of the paradigmatic civil works of the 20th century. Its characteristic hydroelectric power station attached to the dam has made it an indisputable reference among architects, engineers and historians. And this polyhedral look is not accidental, since from its beginning, it was proposed as a multidisciplinary project related to large territorial plans. Irrigation in the Guadalquivir valley and an ambitious project to channel the river between Cordoba and Seville were the reasons why this work was built, but the origin of the unique solution that characterizes its hydroelectric use is less known and is actually a result decanted throughout successive projects.
引用
收藏
页数:11
相关论文
共 24 条