Experimental Investigation of the Original Project of Yukari Kalekoy Dam and Hydroelectric Power Plant Spillway

被引:0
|
作者
Gogus, Mustafa [1 ]
Altan-Sakarya, A. Burcu [1 ]
Koken, Mete [1 ]
机构
[1] Middle East Tech Univ, Dept Civil Engn, Hydromech Lab, TR-06800 Ankara, Turkey
关键词
hydraulic model; spillway; spillway aerators; cavitation;
D O I
10.1016/j.proeng.2016.08.563
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Hydraulic model tests of the spillway of Yukar Kalekoy Dam and Hydroelectric Power Plant (HPP) were carried out at Hydromechanics Laboratory of Middle East Technical University (METU), Ankara. In order to investigate the flow conditions in the approach channel, over the weir structure, around the spillway piers, along the spillway chute channels and after the flip buckets, and also to observe the performance of the aeration devices, a model of 1/70 length scale was constructed. The model area covers an about 400 m x 450 m section of the Yukar Kalekoy reservoir, the whole spillway structure and a part of the river area of about 150 m x 200 m downstream of the flip buckets. Experiments were carried out at various discharges; QPMF, Q(1000) and Q(100) with fully open radial gates as well as with partly open radial gates at Q(1000). Flow depths, pressure heads of the flows along the spillway structure were measured, cavitation indexes and air concentrations of the flows were determined. From the observations and experimental results, it was concluded that the flow conditions in the approach channel of the spillway, over the weir structure, around the spillway piers, along and after the flip buckets are quite good from the hydraulics point of view. However, the flows were not sufficiently aerated in the spillway chutes, in Channels I and II, after the available aerators presented in the original design of the spillway. After the experiments conducted on the "original model" it was decided that some modifications should be done. In order to improve the performance of the available aerators, the heights of the aerator deflectors were increased by 0.20 m by keeping their lengths in the flow direction almost as before. (C) 2016 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:313 / 317
页数:5
相关论文
共 50 条
  • [1] Simulation of flow on the hydroelectric power dam spillway via OpenFOAM
    Noor Muhammad
    Naeem Ullah
    [J]. The European Physical Journal Plus, 136
  • [2] Simulation of flow on the hydroelectric power dam spillway via OpenFOAM
    Muhammad, Noor
    Ullah, Naeem
    [J]. EUROPEAN PHYSICAL JOURNAL PLUS, 2021, 136 (11):
  • [3] Hybrid Simulation of Hydrodynamics of Hydroelectric Power Plant Spillway Structures
    Prokof’ev V.A.
    Sudolskii G.A.
    [J]. Power Technology and Engineering, 2022, 55 (05) : 714 - 719
  • [4] Investigation of leakage at Ataturk dam and hydroelectric power plant by means of hydrometric measurements
    Unal, Bunyamin
    Eren, Mucahit
    Yalcin, M. Gurhan
    [J]. ENGINEERING GEOLOGY, 2007, 93 (1-2) : 45 - 63
  • [5] Power play (Proposed hydroelectric dam project in Iceland)
    Klein, D
    Vuijst, F
    [J]. SMITHSONIAN, 2002, 33 (05) : 16 - 16
  • [6] Lessons learned: Failure of a hydroelectric power project dam
    Uddin, N
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2005, 19 (01) : 69 - 77
  • [7] Experimental Investigation of the Anti-Vortex Devices of Beyhan 1 Dam and Hydroelectric Power Plant Water Intake Structure
    Gogus, Mustafa
    Altan-Sakarya, A. Burcu
    Koken, Mete
    [J]. WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM 2016, WMCAUS 2016, 2016, 161 : 881 - 886
  • [8] Experimental Investigation of Flow Conditions over Cambasi Dam Spillway
    Altan-Sakarya, A. Burcu
    Aydin, Ismail
    Gogus, Mustafa
    Koken, Mete
    [J]. PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS I AND II, 2013, : 5748 - 5755
  • [9] Lessons from the failure of the LS Hydroelectric Power Project dam
    Uddin, N
    [J]. FILTRATION AND DRAINAGE IN GEOTECHNICAL/GEOENVIRONMENTAL ENGINEERING, 1998, (78): : 192 - 204
  • [10] Hydraulic studies in support of the construction of a stepped spillway at the Boguchany hydroelectric power plant
    Sudol’skii G.A.
    [J]. Power Technology and Engineering, 2017, 50 (05) : 487 - 495