Experimental Investigation of the Original Project of Yukari Kalekoy Dam and Hydroelectric Power Plant Spillway

被引:0
|
作者
Gogus, Mustafa [1 ]
Altan-Sakarya, A. Burcu [1 ]
Koken, Mete [1 ]
机构
[1] Middle East Tech Univ, Dept Civil Engn, Hydromech Lab, TR-06800 Ankara, Turkey
关键词
hydraulic model; spillway; spillway aerators; cavitation;
D O I
10.1016/j.proeng.2016.08.563
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Hydraulic model tests of the spillway of Yukar Kalekoy Dam and Hydroelectric Power Plant (HPP) were carried out at Hydromechanics Laboratory of Middle East Technical University (METU), Ankara. In order to investigate the flow conditions in the approach channel, over the weir structure, around the spillway piers, along the spillway chute channels and after the flip buckets, and also to observe the performance of the aeration devices, a model of 1/70 length scale was constructed. The model area covers an about 400 m x 450 m section of the Yukar Kalekoy reservoir, the whole spillway structure and a part of the river area of about 150 m x 200 m downstream of the flip buckets. Experiments were carried out at various discharges; QPMF, Q(1000) and Q(100) with fully open radial gates as well as with partly open radial gates at Q(1000). Flow depths, pressure heads of the flows along the spillway structure were measured, cavitation indexes and air concentrations of the flows were determined. From the observations and experimental results, it was concluded that the flow conditions in the approach channel of the spillway, over the weir structure, around the spillway piers, along and after the flip buckets are quite good from the hydraulics point of view. However, the flows were not sufficiently aerated in the spillway chutes, in Channels I and II, after the available aerators presented in the original design of the spillway. After the experiments conducted on the "original model" it was decided that some modifications should be done. In order to improve the performance of the available aerators, the heights of the aerator deflectors were increased by 0.20 m by keeping their lengths in the flow direction almost as before. (C) 2016 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:313 / 317
页数:5
相关论文
共 50 条
  • [41] Omsk Hydroelectric Power Plant Project in Economic History of Region in 1930s-1980s
    Mostovenko, Maxim S.
    [J]. NAUCHNYI DIALOG, 2024, 13 (01): : 431 - 447
  • [42] Hydraulic transient simulation and characteristic investigation on Kaplan type hydroelectric power Plant with open channel
    Chen, S.
    Zhang, J.
    Yu, X. D.
    [J]. 29TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS, 2019, 240
  • [43] EXPERIMENTAL INVESTIGATION OF THE POWER-PLANT ELECTRILIZATION PROCESSES
    MURAVEV, GB
    SABIROV, RK
    CHAKKAYEV, TA
    POTAPOV, GP
    ZADNEV, AA
    [J]. IZVESTIYA VYSSHIKH UCHEBNYKH ZAVEDENII AVIATSIONAYA TEKHNIKA, 1991, (02): : 103 - 106
  • [44] EXPERIMENTAL INVESTIGATION OF A REFRIGERANT AS A COOLANT OF A POWER PLANT CONDENSER
    Yousef, Khaled
    Bolin, Christopher
    Engeda, Abraham
    Hegazy, Ahmed
    [J]. INTERNATIONAL JOURNAL OF AIR-CONDITIONING AND REFRIGERATION, 2014, 22 (04)
  • [45] Determining the natural frequencies of the dam at the Sayano-Shushenskaya hydroelectric power plant based on data from a seismometer system and computations
    Egorov A.Y.
    Kostylev V.S.
    Sarantsev M.I.
    [J]. Power Technology and Engineering, 1600, Springer Science and Business Media, LLC (50): : 506 - 510
  • [46] Buffer Sizing Model Incorporating Fuzzy Risk Assessment: Case Study on Concrete Gravity Dam and Hydroelectric Power Plant Projects
    Balta, Semsettin
    Birgonul, M. Talat
    Dikmen, Irem
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2018, 4 (01):
  • [47] Investigation of data communication systems in Lungmen Nuclear Power Plant Project
    Chaung, CF
    Chou, HP
    [J]. IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 2006, 53 (03) : 1443 - 1449
  • [48] Slope stability modelling and landslide hazard zonation at the Seymareh dam and power plant project, west of Iran
    Koleini, Mehran
    Van Rooy, Jan Louis
    Bumby, Adam
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2012, 71 (04) : 691 - 701
  • [49] Slope stability modelling and landslide hazard zonation at the Seymareh dam and power plant project, west of Iran
    Mehran Koleini
    Jan Louis Van Rooy
    Adam Bumby
    [J]. Bulletin of Engineering Geology and the Environment, 2012, 71 : 691 - 701
  • [50] Investigation of Water Dynamics Nearby Hydroelectric Power Plant of the Gorky Reservoir on Water Environment: Case Study of 2022
    Molkov, Aleksandr
    Kapustin, Ivan
    Grechushnikova, Maria
    Dobrokhotova, Daria
    Leshchev, George
    Vodeneeva, Ekaterina
    Sharagina, Ekaterina
    Kolesnikov, Anton
    [J]. WATER, 2023, 15 (17)