WORKOVER REQUIREMENTS FOR DEEPWATER SUBSEA WELLS.

被引:0
|
作者
Sizer, Phil [1 ]
O'Sullivan, Jim [1 ]
机构
[1] Otis Engineering Corp, Otis Engineering Corp
来源
Ocean industry | 1985年 / 20卷 / 07期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:44 / 47
相关论文
共 50 条
  • [41] Reliability of deepwater subsea blowout preventers
    Holand, P
    SPE DRILLING & COMPLETION, 2001, 16 (01) : 12 - 18
  • [42] HT/HP x-tree and down-hole fiber optic connectors and their uses on subsea intelligent wells.
    Wright, P
    Barlow, S
    FIBER OPTIC SENSOR TECHNOLOGY AND APPLICATIONS III, 2004, 5589 : 233 - 244
  • [43] Subsea gas lift in deepwater applications
    Jayawardena, Subash S.
    Zaboras, George J.
    Dykhno, Leonid A.
    JPT, Journal of Petroleum Technology, 2008, 60 (06): : 64 - 67
  • [44] FORTIFYING SUBSEA WELLS
    Sihvo, Ville
    Nerg, Janne
    Pyrhonen, Juha
    Brenne, Lars
    IEEE INDUSTRY APPLICATIONS MAGAZINE, 2013, 19 (06) : 56 - 65
  • [45] Jocelin of Wells. Bishop, Builder, Coutier
    Coppack, Glyn
    MEDIEVAL ARCHAEOLOGY, 2011, 55 : 411 - 411
  • [46] Charged excitons in GaAs quantum wells.
    Finkelstein, G
    BarJoseph, I
    NUOVO CIMENTO DELLA SOCIETA ITALIANA DI FISICA D-CONDENSED MATTER ATOMIC MOLECULAR AND CHEMICAL PHYSICS FLUIDS PLASMAS BIOPHYSICS, 1995, 17 (11-12): : 1239 - 1245
  • [47] Decisive Factors for the Productivity of Oil Wells.
    Manolescu, G.
    Mine, petrol si gaze, 1987, 38 (11): : 526 - 531
  • [48] Temperature Buildup in Oil and Gas Wells.
    Romero Juarez, A.
    Revista del Instituto Mexicano del Petroleo, 1980, 12 (01): : 69 - 76
  • [49] Problem of Electric Logging of Encased Wells.
    Litvinov, S.Ya.
    Mamedov, N.V.
    Izvestiya Vysshikh Uchebnykh Zavedenii, Neft i Gaz, 1974, (12): : 15 - 18
  • [50] EIGENVALUES OF VERY NARROW QUANTUM WELLS.
    Marsh, A.C.
    1600, (01):