共 50 条
- [1] AUGMENTATION OF WELL PRODUCTIVITY WITH SLANT AND HORIZONTAL WELLS. JPT, Journal of Petroleum Technology, 1988, 40 (06): : 729 - 739
- [2] Temperature Buildup in Oil and Gas Wells. Revista del Instituto Mexicano del Petroleo, 1980, 12 (01): : 69 - 76
- [4] IMPROVED COMPLETION PRACTICES YIELD HIGH PRODUCTIVITY WELLS. Petroleum Engineer International, 1981, 53 (05): : 23 - 26
- [7] Considerations Regarding the Period of Natural Flow of Oil Wells. Mine, petrol si gaze, 1985, 36 (08): : 410 - 413
- [8] Functional Display Device for Spatial Imaging of Oil Wells. Izvestia vyssih ucebnyh zavedenij. Priborostroenie, 1979, 22 (09): : 74 - 77