WORKOVER REQUIREMENTS FOR DEEPWATER SUBSEA WELLS.

被引:0
|
作者
Sizer, Phil [1 ]
O'Sullivan, Jim [1 ]
机构
[1] Otis Engineering Corp, Otis Engineering Corp
来源
Ocean industry | 1985年 / 20卷 / 07期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:44 / 47
相关论文
共 50 条
  • [31] The Impossible Lives of Greta Wells.
    Carr, Susan
    LIBRARY JOURNAL, 2013, 138 (04) : 70 - 71
  • [32] VELOCITY SURVEYS IN DEVIATED WELLS.
    Goins, Neal R.
    1600, (85):
  • [33] Rational Methods of Exploiting Wells.
    Khalimov, E.M.
    Timashev, E.M.
    Oil Industry, 1975, (01): : 18 - 21
  • [34] Sealing the Annular Space of Wells.
    Karimov, N.Kh.
    Peters, V.I.
    Gubkin, N.A.
    Oil Industry, 1980, (02): : 51 - 52
  • [35] TWO-PHASE WELLS.
    Gudmundsson, Jon S.
    Bulletin. Geothermal Resources Council, 1986, 15 (03): : 10 - 16
  • [36] SEALING ABANDONED WATER WELLS.
    Anon
    Water Well Journal, 1973, 27 (04): : 31 - 32
  • [38] Hydrates on the subsea wellhead in deepwater wells: Study on the growth mechanisms, impacts on drilling safety, and possible solutions
    Zhang, Bailing
    Yang, Jin
    Takbiri-Borujeni, Ali
    Sun, Ting
    Edrisi, Ali Reza
    Takbiriboroujeni, Hojatollah
    Wu, Xudong
    Liu, Hexing
    Bo, Zhou
    INTERPRETATION-A JOURNAL OF SUBSURFACE CHARACTERIZATION, 2018, 6 (04): : T1081 - T1093
  • [39] Management of typhoon: A subsea, deepwater development
    Ring, JN
    Bourgeois, CS
    Howard, J
    Melillo, AJ
    Neal, SL
    Smith, S
    SPE RESERVOIR EVALUATION & ENGINEERING, 2004, 7 (05) : 326 - 333
  • [40] CONCENTRIC WORKOVER OPERATIONS IN DEEP SOUR WELLS
    FINCHER, NE
    JOURNAL OF PETROLEUM TECHNOLOGY, 1980, 32 (10): : 1674 - 1678